My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1477
>
2800 - Aboveground Petroleum Storage Program
>
PR0523160
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 10:31:53 AM
Creation date
10/2/2018 11:28:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523160
PE
2832
FACILITY_ID
FA0010602
FACILITY_NAME
WILLIAMS TANK LINES
STREET_NUMBER
1477
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16336003
CURRENT_STATUS
01
SITE_LOCATION
1477 TILLIE LEWIS DR
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 '' <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />Aboveground Petroleum Storage.Act Inspection `R-epoAr'' <br />Facility Name: <br />WILLIAMS TANK LINES <br />Facility Address: <br />1477 TILLIE LEWIS DR STOCKTON <br />Date: <br />Aril 14 2015 <br />SPCC Plan Requirements for Onshore Faciliub (excluding production facilities) <br />723 <br />CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping <br />❑ V ❑ R ❑ COS <br />724 <br />CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service <br />❑ V ❑ R ❑ COS <br />725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction <br />❑ V ❑ R ❑ COS <br />726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves, piping, and appurtenances <br />❑ V ❑ R ❑ COS <br />727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on <br />❑ V ❑ R ❑ COS <br />728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations <br />❑ V ❑ R ❑COS <br />4010 See below Unlisted Administration/Documentation violation ❑ V ❑ R ❑ COS <br />4020 See below Unlisted Training violation ❑ V ❑ R ❑ COS <br />4030 See below Unlisted Operations/Maintenance violation ❑ V ❑ R ❑ COS <br />4040 See below Unlisted Release/Leaks/Spills violation ❑ V ❑ R ❑ COS <br />SUMMARY 0 =VIOLATIO <br />(CLASS I, CLASS II, or MINOR - Noticet6. ... <br />My <br />Item # <br />Remarks <br />301 <br />CFR 112.5(a) Failed to amend Plan as necessary. <br />The SPCC Plan has not been amended to accurately represent the current operations at the facility. The plan lists <br />Mike Thomas as a designated spill personnel; according to Garth Williams, Mr. Thomas has been gone approximately <br />a year. The Plan states that the diesel tank is used a "Veeter-Root" system which gets an annual overfill alarm <br />system certification; no such system is at the facility. The Plan lists varied volume amounts for the used oil totes <br />and the volumes of their spill pallet; the totes observed on site were 220 gallons. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan must be amended when there is a change in the facility design, construction, operation, <br />or maintenance that materially affects its potential for a discharge, within 6 months of the change, and implemented <br />as soon as possible, not later than 6 months following preparation of the amendment. Immediately make all <br />necessary amendments to the SPCC Plan to accurately represent the procedures and policies currently in place at <br />the facility. <br />This is a minor violation. <br />302 <br />CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan was written on February 22, 21510 and has not had a <br />full review and evaluation. A review and evaluation of the SPCC Plan must be conducted at least once every 5 years. <br />As a result of this review and evaluation, the SPCC Plan must be amended within 6 months of review, and recertified <br />by a Professional Engineer if any technical amendments were made. Immediately conduct a review of the facility <br />SPCC Plan and make any necessary amendments. <br />This is a Class II violation. <br />Received byI <br />(initial): AAV -1,0- <br />Inspector: <br />I STACY RIVERA, Senior REHS <ST'*-� <br />Phone: <br />(209) 468-3440 <br />Date: <br />04/14/2015 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.