My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For the V-300, 3 pipe, place 3 marks, at 1 2" and 3" P-300-5C Pressure Piping <br /> inches (2.5. 5 and 7.5 cm.). and follow the same proce- Installation <br /> dure. Poly-Tech V-series piping is normally air pressure <br /> tested at 5-10 p.s.i. In addition. perform any flow or The final product to cover is P-300-SC, 3" pressure pip- <br /> blockage tests required prior to backfill. ing. P-300-SC has a large volume secondary contain- <br /> Che Poly-Tech VVB connection box, or octagon fitting, went jacket and uses a clamp-type fitting.This brass fit- <br /> is another unique product from APT It is custom pro- ting is also used on APT's 3" and 4" offset fill piping. <br /> duced at the factcry for each installation, and allows for The fitting installs just like the brass fitting for the P- <br /> manifoiding of tanks, above-ground plastic to above- 175-SC, except that there is a spacer bar for use on the <br /> ground steel vent connections, or tying the Stage II thicker walled P-300 to ensure that it goes metal to <br /> vapor recovery systems into the tank vent system, using metal. This spacer is not used with our V-Series, vent <br /> a pressure/vacuum relief valve on the vent riser pipe. piping or R-series remote fill piping. <br /> These units are assembled and pressure tested at the fac- <br /> tory so that field installation is a snap. The secondary jacket on P-300-SC products must be <br /> supported to allow proper sealing of test and entry <br /> boots. An 8" long piece of tubing is included, which is <br /> inserted to provide reinforcement for both test and entry <br /> - - boots. This tube should extend under the entry boot <br /> *_ clamp so that it will not seal off the secondary when <br /> tightening the boot. You must locate the secondary cut- <br /> "- back accordingly to ensure this lines up properly. <br /> Y <br /> Trouble-Free Installations <br /> APT's VVB-100,vent/vapor recovery connection box. Poly-Tech piping can be installed in as little as one-third <br /> the time of double-walled rigid fiberglass piping. There <br /> After primary piping pressure test is completed and all are no joints to taper,clean,glue, or cure. Since the pipe <br /> sumps are assembled, the backfilling process can begin. arrives at the job site with the secondary jacket already <br /> Make sure to leave at least 4"of separation between each in place, both primary and secondary PP <br /> t e are installed <br /> piping run, and that the backfill material is packed at the same time, making one pass down the trench. <br /> tightly around the pipe. Remember, any crossovers in <br /> the piping runs should be separated by at least 3" of <br /> backfill. The Poly-Tech system design allows for retesting of the <br /> secondary jacket at any time during the life of the facil- <br /> Once again, approved backfill materials are pea gravel or ity. Simply slide all air test boots over the end of the sec- <br /> tumbled crushed rock, having a natural round surface ondary containment jacket and repressurize. <br /> and practice size of not less than 1/8" or larger than <br /> 3/4", or clean washed sand. Sand must be compacted. As with all piping systems, the key to a long life, trouble <br /> free installation is making sure that all equipment is <br /> installed properly. We have given you the proper tech- <br /> niques to make long-life, trouble free installations. <br /> 122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.