Laserfiche WebLink
NtI:LIVki: <br />FEB 2 5 2016 <br />C: K I I I %!0 r1 Kih A i -r A i <br />TTiUR J�T <br />Fitt aFaia <br />SUN <br />ITEMHF-41-TH DFP.ARTVP7Kl-r <br />0 IRN <br />I D 14W] <br />D I 'N� D ji�N_A D <br />D X. <br />CIECTRICAL CONTROL TAEL <br />C <br />Breake rsfSwItch as - Ensure switches are in the proper position, are not tripped and there are no obvious signs` <br />V"T <br />of tampering or damage <br />V <br />_,77 <br />Docals and Tags - Ensure all breakersiswitches are property and clearly identified <br />I <br />Indicator Lights - Ensure all lights are working correctly and are clearly idenlified <br />Server Cabinet - Ensure there are no red waming Indicators on the front of the servers status panel or the Direct <br />Conned satellite box <br />PLC Cabinet En there arena and oryellow troicaturs an the front ofthe PLC <br />OWS Graphics - Ensure there are no red alarms in the Alarm Bar located on the bottom of the UCOS Runtime <br />3 graphles <br />VOTM <br />Door Locks - Ensure doors are locked and there are no signs of unauthorized entry <br />Enunciator LightslPanal - Ensure correct lights are Wolf Press 'test* button, if equipped to make sure all <br />�4 <br />lights war* conedy. <br />Water L.0. - Look forsigns of water leaking Into MCC <br />s ll77, <br />HVAC - Ensure the healing and cooling system is working property <br />J. <br />La be I I ng - Ensure all equipment, switches and breakers are labeled property for clear Identification <br />72/ <br />a or Drains -Open fo remove an, water end then dose <br />✓ <br />Belts - Ensure the belts are not too light or too loose. Look for signs of weir <br />V/ <br />Gauges -Ensure they worIkcorrectly; Ensure compms3orcomes on1bNalcorrect setpoints <br />V/ <br />- <br />7 <br />Oil Levels - Check oiler or sight glass for level and condition of all <br />✓7,18Sig <br />Abnormal Nois a - Listen for squealing belts, gfinaing, bearings and other noises that aren't normal and could be <br />ren or impending !allure. <br />]Vibration - LooMisten for excessive vibrations that Indicate impending failure <br />V/ <br />4.1 <br />4on-otf Switch - Ensure switch operates comedly <br />']Air Leak - Listen forleaks <br />J <br />Valves - Ensure all valves are in their correct operating position <br />*Qx. <br />'k <br />DAILY- Vi4sually inspect to ensure there are no vapor or liquid leaks <br />6/140 <br />lift <br />STAGE Check for product and vapor leaks. Inspect liquid level to prevent overflowing. Make <br />sure pump works correctly and them am no signs of contamination. <br />-Z,( <br />STAGE 2 Check for product and vaporleaks. Inspect liquid level to prevent overflowing. Make <br />sure pump works correctly and them are no signs of contamination. <br />STAGE 3 Check for product and vapor leaks Inspect liquid level to prevent overl7owing Make <br />sum pump works correctly and there are no signs or conta mina lion <br />any drums are an site? Check for spills, leaks and signs of damage. Ensure drums are stored <br />(j <br />s and am dated, arrange tohave drums removed that are approaching theirstorage deadline <br />Drum Labeling - Ensure all drums are labeled propedy wrthin guidelines, with accumulation start date, and that <br />date is less than 90 days old,, ensure drum ltd Is secured <br />Housekeeping- Leaks orspIffs, keep clean and orderly, ensure only appropriately labeled waste Is stored there <br />