My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2800 - Aboveground Petroleum Storage Program
>
PR0516150
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2018 8:48:09 PM
Creation date
10/15/2018 1:46:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516150
PE
2831
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2.5. Unstable Footing, Physical Obstacles, and Falling Objects <br /> The work area will be inspected by the site safety officer who will advise all personnel of <br /> actual and potential hazards due to unstable footing,physical obstacles, and potential <br /> falling objects prior to the commencement of work activities. <br /> 4.2.6. Overhead Utility Lines <br /> Operations adjacent to overhead lines are prohibited unless one of the following <br /> conditions is satisfied: <br /> ➢ Lockout/tagout procedure. The main electrical switches is in a locked"off'position <br /> for any electrically operated equipment or electrical lines. Deenergized equipment or <br /> circuits are tagged at all points where such equipment or circuits can be energized. <br /> ➢ Equipment or any part does not have the capability of coming within the minimum <br /> clearances for energized overhead lines as specified in Table 1, or the equipment has <br /> been positioned and blocked to assure the part, including cables,cannot come within <br /> the minimum clearances specified in Table 1. <br /> TABLE 1 - Minimum Required Clearances for Overhead Lines <br /> POWER LINES NOMINAL SYSTEM MINIMUM REQUIRED CLEARANCE <br /> (kilovolts) <br /> 50 or under 10 feet (3.05 meters) <br /> 69 12 feet(3.66 meters) <br /> 115-161 15 feet(4.57 meters) <br /> 230-285 20 feet(6.10 meters) <br /> 345 25 feet(7.62 meters) <br /> 500 35 feet(10.67 meters) <br /> 4.2.7. Fire/Explosion <br /> The potential for fire/explosion exists while working with flammable chemicals. <br /> Flammable materials may be used in the operation of the power washer. <br /> When required,bonding and grounding shall be implemented during liquid transfers. <br /> SITE PERSONNEL WILL NOT ENGAGE IN FIRE FIGHTING ACTIVITIES <br /> BEYOND THE INCIPIENT STAGE. THE LOCAL FIRE DEPARTMENT WILL <br /> BE CALLED FOR ANY FIRE EVENT. IF A FIRE REQUIRES MORE THAN <br /> PUSAESTROJECTS12005\05319 SJ CounfyWlSPAm 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.