My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543856
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:20:11 AM
Creation date
10/25/2018 9:53:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543856
PE
3528
FACILITY_ID
FA0006009
FACILITY_NAME
NATIONAL ADVERTISING CO
STREET_NUMBER
2050
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13336046
CURRENT_STATUS
02
SITE_LOCATION
2050 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />NATIONAL ADVERTISING COMPANV— ADDITIONAL SUBSURFACE INVEST]GATION HEALTH AND SAFETYPLAN <br />has been sealed for more than 24 hours .personnel will allow the well to vent for at least 30 minutes <br />prior to performing any work and conduct monitoring as specified in Section 7.1 and Table 7-2. <br />Applicable Safe <br />Work Procedures: Explosive Hazards.(Sectiori 6.4) <br />PPE Requirements: Modified Level D ensemble (see Section 8.2.2) with rubber apron, upgrade may <br />be required based upon results of on-site monitoring (see Table 7-2) <br />Air Monitoringm Y� "" ` .._°' �� '`L .: <br />Requirements_: _. �: }/ As specified in Section 7.1 and Table'7-2:"--- _ .. <br />5.1.5 Groundwater Sampling <br />er`;will 'be .q aired to handle potentially contaminated <br />During groundwater.. sample collection, psonnel , .re <br />groundwater. This presents potential skin contact and inhalation',Ihazards due to the, potential for <br />contaminants io'be'located.in.xthe groundwater. Personnel will be required to wear the PPE'specified <br />below to protect against this hazard. In addition, sealed.: monitoring wells can accumulate soil vapors, <br />present inhalation and explosivity hazards. Upon opening any monitoring well which has been sealed or <br />more than 24 hours personnel will allow the well to vent for at least 30 minutes prior to performing any <br />work. <br />o� Applicable Safe 4, <br />Work Procedures v,Explosive Hazards (s ctiori 6.4) t <br />E..& .i. .. <br />I <br />PPE Requirements: Modified Level D ensemble (see ySection 8 2.2) with rubber apron, upgrade may <br />4[ be required based upon results of on-site monitoririg (see Table. 17-.2) <br />s-... � �� '".y �i�q�sai •_ , �i�1;3#` 0i. <br />Air Monitoring :' ' 1 * . r,. 0 <br />t As specific in Section 7�1 and Table 7-2 <br />Requirements: _ P;. <br />r ��' � r� � •...d" -. �'.... ?��•.'��,, `: tp,]' <br />_ 5.1.6 Management/Handling of lnvestigation.Derived Wastes <br />I i Groundwater monitoring activities may .generate various waste materials, including drill cuttings, well <br />>� purge ..Liquids, decontamination:.fluids.land "'`giouiwused �.for,j,backfilling borings, and waste <br />PPEldecontamination materials. All wastes will be containerized and placed into 'drums:_ `Handling of <br />wastes presents a minimal potentia! for skin contact, Inhalation of expected to presenfia hazard., <br />Applicable Safe <br />l y <br />Work Procedure's: -Drum Handling (Sutton <br />astes`i Level D <br />L11 PPE Requirements: Modified Level D PPE (see Section 8.2 2) while containerizing w <br />F .1 PPE (see Section 8.2. 1) while handling waste containers <br />Air Monitoring r .. ¢ X.�a tr,rp <br />Requirements: <br />q <br />a�: . ,sfil'::'';« cl �k �.v��.As .:. <br />5.1.7 Unanticipated Work -Activities ro riate safety <br />i <br />x <br />Where work activities are identified be h cnh are notimplemented. <br />adPrior eto'nnithatiois n of work activities any <br />documentation and procedures will P <br />�. le to the specific'work activities tobe undertaken,nd <br />contractor organization.taskedwlth performance cabsuch work. will submit a work procedure document <br />sub r• rocedures apple - <br />which presents appropriate safety pro <br />d safety procedures will be reviewed by the <br />nd [hetrequ requirements presented in l this HASP Work <br />Submitte Y uirements a <br />". compliance with applicable regulatory req <br />02109!98 <br />lnachasp.docXi F k S 31 .tYS4 ' k o <br />hslprojsuplcom <br />t' ., „L s ► : I + `.. Ile <br />chronic low-level exposure. The OSHA <br />
The URL can be used to link to this page
Your browser does not support the video tag.