Laserfiche WebLink
AF,/?A/1999 1 A; 22 2A9-8?5-47F.7 PQI_-'.THFT PQGF n7/ I G <br />The area dispatcher for these organizations will be <br />notified o£ the times and dates that the work will be done. <br />7..1 personnel Protective Equipment WE) <br />a. Steel. toed shoes <br />b. Yard hat <br />c. Safety classes <br />d. Gloves, leather for material handling <br />Other PPE may be required depending on changes made in the <br />held <br />8.0 Training <br />All personnel who may be associated with the tank removal <br />activities must provide documentation of the following <br />A. Updated certificates for various equipment training <br />B. Project- specific training will be providing at the site before <br />tank removal into the UST. <br />C. The contents of the Health and Safety Plan have been <br />reviewed by each site worker <br />D..A discussion of the health and safety hazards, protective <br />measures, and work practices. <br />4.0 Medical Surveillance <br />No pre -work medical examine is necessary <br />X0.0 Decontamination <br />