Laserfiche WebLink
GOLD BOND BUILDING PRODUCTS 3 25 MAY 1986 <br /> this contingency. <br /> SUMMARY <br /> Tank removal will not begin until a closure plan is approved by State and County officials. To <br /> accurately determine the ground water gradients and assess if the waste solvents tanks are <br /> actually upgradient of the product tanks, our office suggests that the investigations begin with <br /> the solvent waste tanks. <br /> RGA <br /> 1�yl <br />