Laserfiche WebLink
was stationed just outside the building entrance. The inspectors also observed an <br />inspection log demonstrating weekly inspections of containers in the building. The <br />inspectors did not observe any potential RCRA violations at Building 816. <br />Magazine <br />All of the magazines in the HWSF are located in close walking proximity to each other. <br />Magazine 2 is a corrugated metal structure approximately 300 square feet in area. The <br />current HWFP allows slightly over 3,200 pounds of explosive or reactive waste (D003) to <br />be stored in this building. <br />Inside the building, the inspectors <br />observed 4 plastic containers (see <br />photograph to the left) with accumulation <br />start dates of no longer than 271 days (or <br />9 months) prior to the day of the <br />inspection (the oldest of the containers <br />was dated 3/17/10). The containers were <br />all marked as containing explosive <br />material (machine fines), were labeled as <br />reactive and toxic, and noted whether the <br />contents were liquid or solid. According <br />to the facility representatives, the <br />explosive waste is wrapped in paper and placed in a cardboard box which again is <br />wrapped in paper before being placed inside of the plastic containers. The contents of <br />these containers will eventually be taken for treatment in one of the units of the HWTF. <br />Inside the building, the inspectors observed an inspection log demonstrating weekly <br />inspections of containers in the building. The inspectors did not observe any potential <br />RCRA violations at Magazine 2. <br />2. Process Area — Buildinp- 805 <br />The inspectors observed one satellite <br />accumulation area (SAA) within Building 805 <br />which houses a small machine shop for processing <br />mainly aluminum and steel. The SAA consisted <br />of one plastic bucket which contained metal <br />machine fines (see photograph to the right). The <br />container was properly closed, labeled, and the <br />accumulation start date of 3/24/10 was clearly <br />marked. No potential violations were observed <br />inside Building 805. <br />Z <br />