My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8621
>
2200 - Hazardous Waste Program
>
PR0527546
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:45:16 AM
Creation date
10/31/2018 3:52:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527546
PE
2227
FACILITY_ID
FA0017455
FACILITY_NAME
PAPE MACHINERY INC
STREET_NUMBER
8621
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
193-320-005
CURRENT_STATUS
01
SITE_LOCATION
8621 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\8621\PR0527546\COMPLIANCE INFO 2007 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2016
QuestysRecordDate
7/16/2018 10:20:56 PM
QuestysRecordID
3942430
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Used Oil Storage Tank/ mm h A <br /> Containment Integrity Report mm M= <br /> for HMT Inspection <br /> Pap6 Machinery, Inc. May 5,2015 <br /> French Camp, CA Page 14 of 41 <br /> CONTAINMENT ASSESSMENT AND EVALUATION (CONT'D.) <br /> 6. Pursuant to Section 66264.193€(1)(A); While this secondary <br /> containment (double-wall tank construction) is directly exposed to <br /> weather, the secondary double-wall tank construction makes <br /> inapplicable the volume requirements for further external <br /> containment; <br /> 7. There is direct exposure to normal weathering environment and <br /> rainfall can accumulate in the areas (no run-off collection) under this <br /> arrangement but there is no requirement for further containment <br /> based on the double-wall construction details; <br /> 3.2 PIPING ASSESSMENT AND EVALUATION <br /> We have evaluated the Storage Tank connecting piping and find the following to be true.. <br /> Tank connecting piping has now and will continue to contain in the future liquids <br /> that can be classified as non-RCRA hazardous materials. <br /> The following assessment details are known or have been evaluated.- <br /> 1. <br /> valuated:1. Pursuant to Section 66264.193(g); The connecting piping is <br /> designed and constructed of single wall details that will not contain <br /> any minor leak of stored liquid should it occur; <br /> ,,f V 2. Pursuant to Section 66264.193(g); The connecting piping is free <br /> �op of defects and may temporarily retain these non-RCRA hazardous <br /> materials until such leaks or spills are detected and cleaned up; <br /> 3. Pursuant to Section 66264.193(g); The connecting piping to the <br /> tank is adequately constructed according to accepted industry <br /> practice; <br /> 4. Pursuant to Section 66264.193(g); The connecting piping is <br /> properly designed and of suitable strength and thickness; <br /> 5. Pursuant to Section 66264.193(g); The hazardous materials <br /> action plan currently in place at the facility provides for any leakage <br /> or spills from the tank piping to be cleaned up as soon as detected <br /> (visual monitoring of this area is performed daily by the operators <br /> responsible for this operations area); <br /> NDTRPTNE.DOT REV 2 232-63333 Pape Machinery CA DTSC Used Oil Tank report rev2 5/15/2015 4:26 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.