My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2012-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 9:51:31 AM
Creation date
11/1/2018 10:44:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2012-2013
FileName_PostFix
2012-2013
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MANUAL <br />FOR A BRAVO CONV-RETROFIT-PLATE K I T <br />INSTALLING CONTRACTOR MUST BE BRAVO CERTIFIED TO INSTALL <br />THIS PRODUCT AND AUTHORIZED IN WRITING BY BRAVO PER THE <br />INSTRUCTIONS OUTLINED IN "Bravo_CONV_Retrofit_Plan_R1.pdf" <br />ALLDOCUMENTSFOUNDAT www.sbravo.com/conv <br />The following is a Bravo Factory -Approved procedure for the State Approved UDSCCS Bravo CONY <br />B2000 Dispenser Conversion Frame. This retrofit procedure is necessary when the existing conduits are <br />protruding through the concrete on the exterior of the existing UDC. <br />NOTE: The drainage panels (downward -angled steel panels) of the conversion frame that channels any <br />leaking fuel to the UDC's interior do not have the openings for the conduits pre-cut by the factory. <br />A Bravo -Certified contractor is required to cut openings in these panels in the field. Please review the <br />following guidelines. <br />CRITICAL CONTACT RULE: You must maintain a minimum of <br />one full inch (11") of contact between the FRP retrofit plate and the steel <br />louvers on all edges except the edge nearest the center of the UDC. <br />STEP 1) You must make the openings that you cut as small as possible in diameter. Depending <br />on the situation, E -Y's or other threaded components will require larger diameter holes to be cut in the <br />frame. Precisely measure the electrical components that must protrude through the frame and cut out <br />each shape as closely as possible. <br />STEP 2) When the holes have been made for all conduit protrusions, dry -fit the modified <br />conversion frame and re -cut as necessary. <br />STEP 3) Then drill a hole in the FRP plate as close to the conduit diameter as possible, for each <br />location. Plan your hole saw cuts so that they are well spaced and all inside the FRP plate. If conduits <br />are too close together, you may cut a single hole/window for multiple conduits to protrude through. <br />STEP 4) Then cut the FRP plate in half centered as much as possible along the holes you have <br />made in it. Dry fit this retrofit plate to the conduits and check for proper fit and contact per the <br />CRITICAL CONTACT RULE. Re -cut and dry -fit the FRP plate as necessary until it's edges can meet <br />without issue and the plate sits squarely flat against the remainder of the steel louvers. <br />STEP 5) Prepare all contact surfaces that will be bonded together by abrading them by hand with <br />low -grit sandpaper. Make sure to rough up the epoxy -coated steel louvers for maximum bond <br />strength. <br />1 ii -CONY -Retrofit -Plate -12B - 9/24/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.