Laserfiche WebLink
I <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. 5-01-269, Revision 1 <br /> CALIFORNIA WATER CODE SECTION 13267 <br /> FOR <br /> KEARNEY-NATIONAL, INC. AND <br /> UPRIGHT CONSTRUCTION <br /> FORMER KEARNEY-KPF FACILITY <br /> GROUNDWATER TREATMENT AND DISPOSAL SYSTEM <br /> SAN JOAQUIN COUNTY <br /> This monitoring and reporting program (MRP)incorporates requirements for monitoring of the <br /> treatment process and effluent. This MRP is issued by the Executive Officer of the California <br /> Regional Water Quality Control Board, Central Valley Region(Regional Board) pursuant to <br /> California Water Code Section 13267. The Discharger shall not implement any changes to this <br /> MRP unless and until a revised MRP is issued by the Executive Officer. This MRP revises the <br /> requirements listed in MRP No. 5-01-269 issued on 7 December 2001. Specific sample station <br /> locations shall be approved by Regional Board staff prior to implementation of sampling activities. <br /> All samples shall be representative of the volume and the nature of the discharge and matrix of the <br /> sampled medium. The time, date, and location of each grab sample shall be recorded on the <br /> sample chain of custody form. <br /> Field testing instruments(such as those used to test pH and dissolved oxygen) may be used <br /> provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments; <br /> 2. The instruments are calibrated prior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended <br /> frequency; and <br /> 4. Field calibration reports are provided with the appropriate monitoring report. <br /> As shown on Attachment 1 and listed below,the Site has 12 shallow zone monitoring wells <br /> (MWs), seven shallow zone piezometers, 17 intermediate zone MWs, two intermediate zone <br /> piezometers, six deep zone MWs, and one production well which has been disconnected. Of these <br /> 45 wells, one deep well (INJ-1), three shallow piezometers (KPS-5,TP-lA and TP-3A), four <br /> shallow MWS (SMW-1, SMW-2, SMW-4, and SMW-5), and/or two intermediate MWs (KEW-IU <br /> and KEW-2U)may be used as injection wells. Five intermediate zone MWs (KEW-3U, KEW-4U, <br /> KI-3, KI-5, and KI-12) are used as extraction wells. T <br /> Shallow Zone Monitor Wells: KS-1, KS-2, KS-4, KS-5, KS-6, KS-8, TP-IA, TP-2A, <br /> TP-3A, and KPS-5 <br /> Shallow Zone Piezometers: B-1, B-4, B-5, SMW-1, SMW-2, SMW-3, SMW-4, SMW-5, <br /> and SMW-6 <br /> Intermediate Zone Monitor Wells: KI-2, KI-3, KI-4,KI-5,KI-6,KI-8,KI-11,KI-12,KI-13, <br /> KI-14,KI-16, KI-17,PX-1,KEW-IU,KEW-2U, KEW-3U, <br /> KEW-4U,KPL-5, and KPU-5 <br /> Deep Zone Monitor Wells: KD-1, KD-4, KD-5, and KD-6 <br /> Deep Zone Piezometers: DMW-1 and INJ-1 <br /> Production Well: SPW <br />