Laserfiche WebLink
• BRYAN CAVE <br /> i � <br /> Mr. O'Neal and Ms. Lowry <br /> August 19, 1992 <br /> Page 2 <br /> responsibility for installation and testing of the groundwater <br /> treatment system until the system has completed its start-up <br /> testing. <br /> Dudek's operations at the site will conform to the <br /> approved Sampling and Analysis Plan and the existing Quality <br /> Assurance Project Plan for the KPF facility. These plans will be <br /> reviewed at the conclusion of the consultant transition and non- <br /> substantive amendments will be made that reflect the transfer of <br /> consulting responsibilities to Dudek. A small number of <br /> substantive changes may also be submitted for agency review and <br /> approval. The Health and Safety Plan for the facility has <br /> already been modified to reflect the project transition, without <br /> significant substantive changes. <br /> If you have any questions or concerns regarding the <br /> consultant transition, please do not hesitate to contact me at <br /> the above-listed number. A final note for your files: as our <br /> letterhead indicates, my firm has shortened and depunctuated its <br /> name. I have enclosed a revised business card reflecting this <br /> change. <br /> Sincerely, <br /> H. Derr kV eterson <br /> Enclosure <br /> cc: Diane Hinson <br /> Lester Kaufman <br /> Peter Quinlan <br /> 31704 <br />