Laserfiche WebLink
ATTACHMENT A <br /> Compliance Schedule <br /> TAS COMPLIANCE DAT <br /> Begin soil assessment for selection of 25 September 1989 <br /> closure alternative <br /> Submit interim (Phase I) Ground Water 30 September 1989 <br /> Assessment Report <br /> Begin Phase II of ground water 1 February 1990 <br /> assessment <br /> Begin evaluation of closure <br /> alternatives 26 February 1990 <br /> Submit Report of Waste Discharge (for the 27 April 1990 <br /> selected closure alternative) , application <br /> and filing fee <br /> Submit Selected Closure Alternative Documentation 27 April 1990 <br /> (to include Soil Assessment Report, Soil <br /> Assessment Health Based Risk Analysis and <br /> Closure Alternative Feasibility Study, <br /> Design and Specification Report) <br /> Submit Selected Closure Alternative 7 June 1990 <br /> Engineering Design Documents <br /> Submit Construction quality Assurance 7 June 1990 <br /> and Health and Safety Plans <br /> Submit post-closure permit application <br /> 25 June 1990 <br /> Begin pond closure 1 August 1990 <br /> Complete pond closure 1 December 1990 <br /> Submit letter of Closure Certification 31 January 1991 <br /> and Closure Certification Report <br /> Submit Phase II Ground Water Assessment Report 31 March 1991 <br />