Laserfiche WebLink
v <br /> SEP 2 8 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:INCON TS-STS Equipment Resolution:0.0001 <br /> Sump#DSL 2 Sump#DSL 2 Sump# Sump# <br /> Sump Diameter: 36" 36" <br /> Sump Depth: 59" 59" <br /> Sump Material: FG FG <br /> Height from Tank Top to Top of 27" 27" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 19" 19" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: FAIR FAIR <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ®Yes❑No❑NA ®Yes❑Nc❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> product and water)?* <br /> Turbine shutdown response time 6 SEC 6 SEC <br /> Is system programmed for fail-safe <br /> ®Yes❑No[INA ®Yes ElNo[INA El Yes ElNo[INA ❑Yes El NO ElNA <br /> shutdown?' <br /> Was fail-safe verified to be <br /> ®Yes❑No ElNA ®Yes❑No[INA El Yes❑No ElNA ❑Yes ElNo ElNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MIN 15 MIN <br /> test: <br /> Test Start Time: 2:28 3:23 <br /> Initial Reading(Ri): 27356 45175 <br /> Test End Time: 2:43 3:39 <br /> Final Reading(RF): 27018 45163 <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF%): 0.0038 0.0012 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 <br /> test Result: ❑Pass ®Fail EODPos ❑Fair. [ ]Pass ' []'Fail ❑;Pass [I Fail <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA Q Yes❑No❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes❑No❑NA ®Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No[INA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br /> 8/24/16—RE-TESTED DSL 2 SIPHON&PASSED. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to gay of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 9 of 15 <br />