Laserfiche WebLink
_ RECEIVE® <br /> SEP 2 S 2016 <br /> UNDER-DISPENSER CONTAINMENT Q TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑PigTAL H EALTH <br /> ❑Other(Spec) rP <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution:0.0001 <br /> UDC#13-14 UDC#14 SAT UDC#8-9 SAT UDC#9-10 <br /> UDC Manufacturer: WAYNE WAYNE WAYNE WAYNE <br /> UDC Material: PLASTIC PLASTIC PLASTIC PLASTIC <br /> UDC Depth: 30" 29" 29" 30" <br /> Height from UDC Bottom to Top 91, 8" 8" 9" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 51, 4" 4" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR FAIR FAIR FAIR <br /> testing: <br /> Portion of UDC Tested' 14" 13" 13" 14" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> product and water)?* <br /> Turbine shutdown response time 6 SEC 6 SEC 6 SEC 6 SEC <br /> Is system programmed forfail- <br /> safe shutdown?' ®yes❑No❑NA ®Yes❑No❑NA ®Yes❑No ElNA ®Yes ElNo ClNA <br /> Was fail-safe verified to be ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15MIN <br /> starting test <br /> Test Start Time: 11:31 11:31 1:28 1:28 <br /> Initial Reading(Ri): 42466 31653 34364 41686 <br /> Test End Time: 11:46 11:46 1:43 1:43 <br /> Final Reading(RF): 42465 31621 34341 38950 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Chane in Reading(Rr R : 0.0001 0.0032 0.0021 0.2736 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 <br /> Test Result: 19 Pass: ❑Fail . ❑Pass. Z Fail - El Pass Fail ❑Pass Fail' ; <br /> Was sensor removed for testing? 11 ®Yes No❑NA Yes No❑NA LjyesLjNoLjNA YcsE]NoEjNA <br /> Was sensor properly replaced and ®Yes❑No❑NA ®Yes❑No❑NA ❑Yes❑No❑NA ®Yes❑No❑NA <br /> verified functional after testis 7 <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire UDC must be tested. (See S WRCB LG-160) <br /> Secondary Containment Test Results 12 of 15 <br />