Laserfiche WebLink
1-iCIiC1 v c.v <br /> -.�e SEP 2 9 2016 <br /> 11. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard EQFt0N" lT krWEAJ <br /> ❑Other(specify) EPARTMENT <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:PRESSURE GAUGE Equipment Resolution: 0.5 PSI <br /> Piping Run#OCT. piping Run#87 Piping Run#91 Piping Run#DSL 1 <br /> 100 <br /> Piping Material: FG FG FG FG <br /> Piping Manufacturer: UNKNOWN UNKNOWN UNKNOWN UNKNOWN <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 300 FT 300 FT 300 FT 300 FT <br /> Product Stored: OCT. 100 GAS GAS DSL <br /> Method and location of BOOT BOOT BOOT BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 10:30 12:00 10:30 12:00 <br /> Initial Reading(Ri): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 11:30 1:00 11:30 1:00 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: IHR IRR I HR I HR <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ®Pass ❑ Fail ®Pass ❑ Fail ® Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ELITE IV REPLACED BOOT ON 87 PROD LINE SECONDARY. <br /> Secondary Containment Test Results 5 of 15 <br />