Laserfiche WebLink
RECEIVED <br /> 12. SECONDARY PIPE TESTING SEP 2 9 2016 <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑vacuum HydDOARTMENT <br /> ❑Other(Spec) <br /> Test Equipment Used:PRESSURE GAUGE Equipment Resolution: 0.5 PSI <br /> Piping Run#87 Piping Run#91 Piping Run#DSL 1 Piping Run#DSL 2 <br /> VENT VENT VENT VENT <br /> Piping Material: FG FG FG FG <br /> Piping Manufacturer: UNKNOWN UNKNOWN UNKNOWN UNKNOWN <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 150 FT 150 FT 150 FT 150 FT <br /> Product Stored: GAS GAS DSL DSL <br /> Method and location of BOOT BOOT BOOT BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 1:20 1:20 1:20 1:20 <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 2:20 2:20 2:20 2:20 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: 1 HR 1 HR 1 HR IHR <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: L®Pass ❑ Fail ® Pass ❑ Fail ®Pass ❑ Fail ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 13. <br /> 14. <br /> Secondary Containment Test Results 6 of 15 <br />