Laserfiche WebLink
RECEIVED <br /> 15. <br /> 16. SECONDARY PH'E TESTING SFE 2 9 2016 <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) 1.1111 <br /> Test Method Used: ® Pressure ❑Vacuum tjWdrta*RTMENT <br /> ❑Other(Spec) <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: 0.5 PSI <br /> Piping Run#DSL 2 Piping Run#TRANS Piping Run# Piping Run# <br /> FILTER SYPHON DSL OCT.100 VENT <br /> Piping Material: FG FG FG FG <br /> Piping Manufacturer: UNKNOWN UNKNOWN UNKNOWN UNKNOWN <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 300 FT 300 FT 300 FT 150 FT <br /> Product Stored: DSL DSL DSL OCT <br /> Method and location of BOOT BOOT BOOT BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 12:00 12:00 10:30 1:20 <br /> Initial Reading(Ri): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 1:00 1:00 11:30 2:20 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: 1 HR IHR IHR 1 HR <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ®Pass ❑ Fail ®Pass ❑ Fail ®Pass ❑Fail ®Pass ❑ Fail <br /> 17. Comments— (include information on repairs made prior to testing, and recommendedfollow-up for failed <br /> tests <br /> Secondary Containment Test Results 7 of 15 <br />