Laserfiche WebLink
RECEIVED <br /> SEP 2 9 2016 <br /> PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer N Industry StaLEquipment <br /> BJFGItd R�m <br /> ❑Other(Sped) PARTMENT <br /> Test Method Used: ❑Pressure ❑Vacuumostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON TS-STS n:0.0001 <br /> Sump#OCT. 100 Sump#91 Sump#87 Sump#DSL 1 <br /> Sump Diameter: 36" 36" 36" 36" <br /> Sump Depth: 65" 63" 63" <br /> Sump Material: FG FG FG FG <br /> Height from Tank Top to Top of 21" 20" 22" 22" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 35" 34" 19" 18" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: FAIR FAIR FAIR FAIR <br /> Portion of Sump Tested' 40" 41" 40" 40" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both N Yes❑No❑NA N Yes❑No❑NA N Yes❑No❑NA N Yes❑No❑NA <br /> product and water)?* <br /> Turbine shutdown response time 6 SEC 6 SEC 6 SEC 6 SEC <br /> Is system programmed for fail-safe N Yes❑No❑NA N Yes❑No❑NA N Yes[-I No❑NA N Yes❑No❑NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> o erational9* N Yes E]No ElNA N Yes ElNo E]NA N Yes[_1No[_1NA N Yes E]No ElNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MIN 15 MIN 15 MIN 15 MIN <br /> test: <br /> Test Start Time: 10:52 10:52 12:18 12:57 <br /> Initial Reading(Ri): 21979 47636 10942 15108 <br /> Test End Time: 11:07 11:07 12:34 1:13 <br /> Final Reading(RF): 21987 47638 10947 15107 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): 0.0008 0.0002 0.0005 0.0001 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 1 0.002 0.002 <br /> Test Result: N Pass ❑Fail N Pass ❑ Fail N Pass ❑ Fail N Pass ❑ Fail <br /> Was sensor removed for testing? N Yes❑No❑NA Yes❑No❑NA N Yes❑No❑NA N Yes❑No❑NA <br /> Was sensor properly replaced and Naas❑No❑NA N Yes❑No❑NA N Yes❑No❑NA N Yes❑No❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 8 of 15 <br />