Laserfiche WebLink
� RECEIVED <br /> SEP 2 9 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 18. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0001 <br /> UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 <br /> UDC Manufacturer: WAYNE WAYNE WAYNE WAYNE <br /> UDC Material: PLASTIC PLASTIC PLASTIC PLASTIC <br /> UDC Depth: 33" 33" 29" 30" <br /> Height from UDC Bottom to Top 7" 7" 8" 91, <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6" 6" 4" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR FAIR FAIR FAIR <br /> testing: <br /> Portion of UDC Tested' 12" 12" 13" 14" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ®Yes E]No[-INA ®Yes E]No[_1NA ®Yes F1No[__1NA ®Yes EJNo —1 NA <br /> product and water)?" <br /> Turbine shutdown response time 6 SEC 6 SEC 6 SEC 6 SEC <br /> Is system programmed for fail- <br /> safe shutdown?" ®Yes[-INo E]NA ®Yes E]No[_1NA ®Yes ElNo ElNA ®Yes❑No[-INA <br /> Was fail-safe verified to be <br /> operational?* ®Yes❑No[-INA ®Yes ElNo[_1NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15 MIN <br /> starting test <br /> Test Start Time: 12:07 12:07 12:07 12:07 <br /> Initial Reading(Ri): 13862 31782 27422 61560 <br /> Test End Time: 12:22 12:22 12:22 12:22 <br /> Final Reading(RF): 13853 31777 27419 61558 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): 0.0009 0.0005 0.0003 0.0002 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: M Pass ❑Fail 0 Pass El Fail Z Pass ❑ Fail Pass Fail <br /> Was sensor removed for testing? Yes❑No NA Yes No NA ZYesLjNoLJNA I NYesLJN0UNA <br /> Was sensor properly replaced and ®yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA I ®Yes❑No❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 10 of 15 <br />