Laserfiche WebLink
.J <br /> 19. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer Z Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> _;Fest Method Used: El ❑Vacuum ® Hydrostatic <br /> Te <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0001 <br /> UDC#5-6 UDC#11 SAT UDC# 11-12 UDC# 12-13 SAT <br /> UDC Manufacturer: WAYNE WAYNE WAYNE WAYNE <br /> UDC Material: PLASTIC PLASTIC PLASTIC PLASTIC <br /> UDC Depth: 33" 29" 30" <br /> Height from UDC Bottom to Top 7„ 8" 9" 81' <br /> of Hi est Piping Penetration: <br /> Height from UDC Bottom to 61' 4„ 5" 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR FAIR FAIR FAIR <br /> testing: <br /> Portion of UDC Tested' 12" 13" 14" 13" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA <br /> product and water)?* <br /> Turbine shutdown response time 6 SEC 6 SEC 6 SEC 6 SEC <br /> Is system programmed for fail- Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be <br /> operational?* [KYes ElNo IDNA Z Yes IDNo I]NA Z Yes IDNo 1:1NA Z Yes ElNo ElNA <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15 MIN <br /> starting test <br /> Test Start Time: 1:36 1:36 1:36 1:36 <br /> Initial Reading(Rj): 43133 37864 50303 37508 <br /> Test End Time: 1:51 1:51 1:51 1:51 <br /> Final Reading(RF): 43125 37865 50276 37510 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): 0.0008 0.0001 0.0027 0.0002 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: Z Pass ❑ Fail Pass ElFail El Pass Z Fail Z Pass 0 Fail <br /> Was sensor removed for testing? Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA <br /> Was sensor properly replaced and Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA Z Yes❑No❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 8/24/16—TROUBLESHOOTING 11/12; ELITE IV ON SITE. TIGHTENED ALL THE BOOT <br /> CLAMPS. BZ FILLED UDC ABOVE ELECRICAL ONLY-FAILED. DISP NEEDS TO BE <br /> PULLED TO MAKE REPAIRS. RECEIVED <br /> L•�`^ E ASEE I V E D <br /> (SE`P 2 9 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 11 of 15 <br />