Laserfiche WebLink
RECE VEE <br /> SEP 2 2 2016 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ®Industry Standard CIV V ftW bM! HEW <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure Cl Vacuum ®Hydrostauc <br /> ❑ Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> UDC#1/2 UDC#3/4 UDC#5/6 <br /> UDC Manufacturer: Environ Environ Environ <br /> UDC Material: Poly Poly Poly <br /> UDC Depth: 31" 31" 31" <br /> Height from UDC Bottom to Top 12" 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good Good <br /> testing: <br /> Portion of UDC Tested 2"above i in 2"above i in 2"above virina <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No RNA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A <br /> Is system programmed for fail- ❑ Yes❑No ®NA ❑Yes❑No RNA ❑Yes❑No RNA <br /> safe shutdown? <br /> Was fail-safe verified to be El Yes❑No ®NA ❑Yes❑No RNA ❑Yes❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 2:23 pot 1:46 pro 2:04 pro <br /> Initial Reading(R,): 3.4649 3.4113 2.7298 <br /> Test End Time: 2:38 pm 2:01 pni 2:19 pro <br /> Final Reading(R,): 3.4652 3.4132 2.7303 <br /> Test Duration: 15 min. 15 min. 15 min. t <br /> Change in Reading(R,-R,): 0.0003 0.0019 0.0005 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +1-0.002" +/-0.002" <br /> Test Result: ® Pass ❑Fail © Pass ❑Fail O Pass ❑Fail <br /> Was sensor removed for testing? M Yes❑No❑NA M Yes❑No❑NA M Yes ❑No❑NA <br /> ==after <br /> properly replaced and ®yes❑No❑NA ®Yes❑No❑NA ®Yes ❑No❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> i <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> t <br />