My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 � RECEIVED <br />F. In -Tank Gauging / SIR Equipment: r Check this box if tank gauging is used only for inventor 7 <br />I Check this box if no tank gauging or SIR equipment is irst�l ! 0 Z Q 15 <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. ENVIRONMENTAL <br />N IRON CENTAL <br />f��a��� ntanor�Ainl�' <br />Complete the following checklist: <br />Yes f No* Has all Input wiring been inspected for proper entry and termination, including testing for ground faults? <br />t' Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />f— Yes No* Was accuracy of system product level readings tested? <br />r Yes r No* Was accuracy of system water level readings tested? <br />Yes r No* Were all probes reinstalled properly? <br />• Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs; are not installed, <br />Complete the following checklist: <br />• Yes <br />r No* <br />For equipment start-up or annual equ4pment certification was a leak simulated to verify LLD performance? (Check all that <br />r o.1 1 0.2 <br />N/A <br />apply) Simulated leak rater 3 g.p.h.; g.p.h; g.p.h. <br />G Yes <br />r No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />(: Yes <br />r No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />No* <br />For mechanical LLDs, does the LLD restrict product Flow if it detects a leak? <br />N/A <br />i+ Yes <br />; No* <br />or electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />G Yes <br />' No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />,, N/A <br />r. Yes <br />r No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />r N/A <br />monitoring system malfunctions or fails a test? <br />GO Yes <br />r No* <br />For electronic LLDs, have ali accessible wiring connections been visually inspected? <br />N/A <br />+ Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />in the 5ecoon n, peiow, uescnoe nvw dnu wiles LP Trac . c .1 <br />Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.