Laserfiche WebLink
• 0 <br />Page 5 of 9 <br />2. PIPING SUAIP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer Industry- Standard LJ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure] Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: See attached testing procedures Equipment Resolution: - <br />Sump # 87 Sump # 91 Sump # �TSump rr <br />Sump Diameter: <br />AO17 <br />48" <br />_- <br />Sump Depth: <br />6�C7" <br />69" <br />Sump Material & Manufacturer: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />1219 <br />1219 <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />21" <br />2411 <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Fair <br />Fair <br />Portion of Sump Tested <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Above highest <br />penetration - <br />Does turbine shut down when <br />sump sensor detects*€squid (both <br />❑ Yes ❑ No ® <br />NA <br />❑Ycs ❑ NO Z NA <br />El ❑ No ® NTA <br />❑ Yes ❑ No NA <br />product and water)? <br />Turbine shutdown response time <br />Is systems programmed for fail-safe <br />❑ Yes ❑ No ® <br />NA <br />❑Yes ❑ No ® i1 A <br />❑Yes ❑ No N NA <br />❑ Yes ❑ No ® NA <br />shutdown?* <br />Was fail-safe verified to be <br />❑ yes [] No N,NA <br />❑Yes ❑ No ® NA <br />[-]Yes [] No Ej NA <br />❑ Yes [] No ® NA <br />operational?' <br />Wait time between applying <br />pressure/vacuum/water and startinb <br />30 minutes <br />30 mimutes <br />30 minutes <br />30 minutes <br />test <br />Test Start Time: <br />10:33am <br />Visual Fail <br />Initial. Reading (Ri): <br />0.0058 <br />Test End Time: <br />10:48am <br />Final Reading (RF): <br />0.0066 <br />Test Duration: <br />15 min <br />Change in Reading (RF-Ri): <br />0.00093 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test kesult:Pass <br />; ❑ ail <br />f ❑ Pass Fail <br />❑ Pass .' ❑ Fail <br />❑; Pass : Q.. Fail., <br />Was sensor removed. for testing? <br />Z Yes E] No L] NA <br />®Yes E] No E] NA <br />Z Yes ❑ No ❑ NA <br />M Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />® Yes D No ❑ NA <br />RYes ❑ No ❑ NA <br />MYes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments — (include information on r�p6 <br />91 STP Sump = leak at sec clam shell <br />made prior to testing, and recommendedr <br />i If the entire depth of the sump is not tested, specify how much was tested. If the answer to qny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />