My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 RECD J U L 20 2015 <br />UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer © Industry Standard ❑ Professional Engineer <br />❑ Other (Speci�) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: see attached testing procedures <br />Equipment Resolution: Inches <br />UDC # 9110 <br />UDC # 11112 <br />UDC # <br />UDC: # <br />UDC Manufacturer: <br />UDC Material <br />Fiberglass <br />Fiberglass <br />UDC De the <br />31" <br />31" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration. <br />9„ <br />9„ <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5^ <br />5 <br />Condition of UDC prior to <br />testing: <br />Fair <br />Fair <br />Fair <br />Fair <br />Portion of UDC Tested <br />Above highest penetration <br />Above highest penetration <br />Above highest penetration <br />Above highest penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />N/A <br />NIA <br />NIA <br />NIA <br />Turbine shutdown response time <br />NIA <br />N/A <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No p NA <br />❑ Yes p No Rl NA <br />❑ Yes ❑ No O NA <br />❑ Yes ❑ No 0 NA <br />Was fail-safe verified to be <br />operational?' <br />❑ Yes ❑ No p NA <br />❑ Yes ❑ No p NA <br />❑ Yes ❑ No p NA <br />❑ Yes ❑ No p NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />2:52pm <br />3:01pm <br />Initial Readm Rt : <br />4.08604 Inches <br />4.83013 Inches <br />Inches <br />Inches <br />Test End Time: <br />3:07pm <br />3:16pm <br />Final Reading Rr): <br />4.08637 Inches <br />4.82982 Inches <br />Inches <br />Inches <br />Test Duration: <br />15 mins <br />15 mins <br />15 mins <br />15 mins <br />Change in Reading (RF -R : <br />0.00033 <br />0.00031 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />'fest Result: <br />p Pass ❑ Fail <br />Z Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />❑ Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing' <br />Yes El No El NA <br />p Yes ❑ No [INA <br />El Yes ❑ No ❑ NA <br />❑Yes ❑ Na [:]NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.