My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SWRC3 January,2002 <br /> Page of <br /> 6. PIPING SUMP TESTING doh T7029132 <br /> Test Method Developed By: ❑ Sump Manufacturer p Industn'Standard <br /> ❑ Professional Engineer <br /> ❑ Other 6)?ecrfirl <br /> Test Method Used: ❑�Pressure ❑ Vacuums <br /> ❑ Q H}�drastatic <br /> Other(.Sped irJ <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: +1-0.002 Inches <br /> Sump# 1 Sump# Sump# S,uln # <br /> Sump Diameter �. <br /> Sunip Depth: 50" <br /> Sump Material: FRP <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 20" <br /> Height froru Tank Top to Lowest <br /> Electrical Penetration: 60- <br /> Condition of sump prior to testing; Good <br /> Portion of Sunup Tested' 2"above i e <br /> Does turbine slut down wheu <br /> sunup sensor detects liquid(both ❑ Ye5 ❑ No X NA ❑Yes ❑ No ❑ NA D Yes ❑No D NA ❑ Yes D No ❑ NA <br /> product and hater)?' <br /> Turbine shutdown response time N/A <br /> Is s}-stem progranuned for fail-safe Dyes ❑No ®NA ❑Yes ❑ No DNA Dyes ❑ No <br /> shutdown?* <br /> ❑ NA Oyes ❑No ❑ NA <br /> Was Lail-safe verified to be ❑ Yes ❑ No IR NA Yes <br /> ❑N ❑ N ❑Ye ❑No ❑NAo erational?' ❑Yes ❑No D NA <br /> Wait time between applying <br /> pressure/vacuunl/rvater and starting 15 min <br /> test: <br /> Test Start Time: 11:26am/11:41am <br /> Initial Reading(RI): 5.2316/5.2329 <br /> Test End Time: 11:41am/11:56am <br /> Final Reading(RF): 5.231915.2319 <br /> Test Duration: 15 min <br /> Change in Reading(RF-RI): +0.0003/-0.0010 <br /> Pass/Fail Threshold or Criteria: +/-0.002" <br /> Test Result: ®Pass ❑Fail Pass ❑ Fail ❑Pass p Fail ❑Pass p Fail <br /> Was sensor removed for testing? ®Yes ❑ No ❑ NA D Yes ❑ No ❑ NA Dyes ONO DNA ❑Yes ❑No D NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? H Yes ❑ Nlo DNA D Yes D No DNA D Yes ❑ No DNA ❑ Yes D No D NA <br /> COM InC[Its--tiuchrde igfonnation on re airs made prior to tesfiitz and recommeurled fo/tali-rr r forfailed festal <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to Au of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.