My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALARM and CONTROL POINT <br /> REVALIDATION PROCEDURE <br /> Purpose for Revalidation <br /> It is Sprint's policy and the BMC's commitment to assure the highest quality and most <br /> dependable service to our customers. <br /> We therefore believe it necessary to routinely inspect and test the alarming system that <br /> keeps our facilities in operation. <br /> At the same time we will take the additional step to test and calibrate all control <br /> components that are so instrumental in the dependable and efficient operation of our <br /> facilities. <br /> The purpose of this document is to establish a method of procedure and a set of standards <br /> to perform the revalidation of control points and alarms in the BAS system. <br /> This document is not intended to be an absolute method of procedure, recognizing that <br /> individual differences from site to site may vary, but should be used as a general guide <br /> and followed as closely as possible wherever possible. <br /> Definitions <br /> BMC Building Management Center <br /> SAS Building Automation System manufactured by Andover controls Co. and <br /> utilized by Sprint in Sprint facilities for control and alarm monitoring of <br /> HVAC & environmental systems. <br /> FAS Facilities Automation Specialist . This is the Andover representative <br /> trained in installing, troubleshooting, servicing and testing the BAS <br /> UPS Uninterruptable Power Supply <br /> Halon Fire suppression agent and system. <br /> Vesda Early warning air sampling system. <br /> CRU Computer Room Unit, a cooling system used primarily for raised floor, <br /> computer room and switch environments. <br /> UST Underground Storage Tank for diesel generator fuel. Tank buried <br /> underground <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.