My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Page S of 8 rnx <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING_ <br /> Test Method Developed By: ❑ Sump Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ® Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Lake Test Equipment Resolution.- <br /> UDC <br /> esolution:UDC# 1 2 UDC # 314 UDC # 516 UDC# 7 8 <br /> UDC Manufacturer: Bravo Box Bravo Box Bravo Box Bravo Box <br /> UDC Material: Steel Steel Steel Steel <br /> UDC Depth: 9" g„ 91, 9" <br /> Height from UDC Bottom to Top of 0" 0" 0" 0" <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest 0'" 0" 0" 0" <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: Dry Dry Dry Dry <br /> Portion of UDC Tested' 50% 500/0 50% 50% <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ❑ Yes ❑ No O NA ❑Yes ❑ No IM NA 0 Yes ❑ No ® NA ❑ Yes ❑ No D NA <br /> and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No 0 NA ❑Yes '❑ No ® NA ❑ Yes ❑ No ® NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No MINA ❑ Yes Q No MINA <br /> o erationalT <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test <br /> Test Start Time: 02:00 02:00 02:00 02:00 <br /> Initial Reading Ri): 4 3/4" 4 1/2" 4 3/4" 5" <br /> Test End Time: <br /> 03:00 03:00 03:00 03:00 <br /> Final Reading(RF): 4 3/4" 4 1/2" 4 3/4" 5" <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr_ <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> PasslFail Threshold or Criteria: 0 0 0 0 <br /> Test Result: d Pass ❑ Fail IHI Pass ❑ Fail I] Pass ❑ Fail 0 Pass ❑ Fail <br /> Was sensor removed for testing? ❑ Yes ❑ No MI NA ❑ Yes ❑ No 1XI NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No 0 NA <br /> Was sensor properly replaced after ❑Yes ❑ No [9 NA ❑Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑Yes ❑ No 0 NA <br /> testin ? <br /> Comments— include information on repairs made prior to testing,and recommended follow-up for failed tests <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. if the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWR.CB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.