Laserfiche WebLink
SWRCB, January 2002 Is 0 Page 3 - <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />171 <br />El <br />Tank Manufacturer ❑ Industry Standard F-1 Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />X❑ <br />El <br />Pressure Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Piping Run # 3 LUB C Piping Run # 3 LUB <br />Piping Material: fiberglass fiberglass <br />Equipment Resolution: <br />Piping Run # LUB AOIdE Piirin Run # 3 LUB ATWO <br />fiberglass fiberglass <br />Piping Manufacturer: <br />smith <br />smith <br />smith <br />smith <br />Piping Diameter: <br />311 <br />311 <br />311 <br />311 <br />Length of Piping Run: <br />671 <br />401 <br />7 r <br />1121" <br />Product Stored: <br />LUBE OIL <br />LUBE OIL <br />LUBE OIL <br />LUBE OIL <br />Method and location of <br />piping -run isolation: <br />LUBE OIL <br />LUBE OIL <br />LUBE OIL <br />LUBE OIL <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min <br />5min <br />- - - <br />Test Start Time: <br />8:4S <br />9:15 <br />------ <br />- - - - <br />Initial Reading (R4 ): <br />3psi <br />3psi <br />- - - - <br />Test End Time: <br />8:46 <br />10:15 <br />- - - <br />Final Reading (RF j: <br />0 <br />3psi <br />- - - <br />- - <br />Test Duration: <br />Imin <br />1hr <br />- - - <br />- - - <br />Change in Reading (RF - I� ): <br />3psi <br />0 <br />- - - <br />- - - <br />Pass/Fail Threshold or <br />cl-iteria: <br />0 <br />0 <br />- - <br />- - - <br />Test Result: <br />Pass IL Y Fail <br />Puss � Fail <br />ElPass ❑ Fail <br />Pass Q Fail <br />Comments - (include information ori repairs made prior to testing, and recommendecl follow-up jor failed tests! <br />RUN al and bl were not tested due to bad boot in transition piping sump. RUN a2 failed <br />at bad boot in the building, b2 failed at bad boot in the transition piping sump. <br />RUN c failed at bad boot in the building. The product in lines bl and 2 is antifreeze, <br />the product in lines a1, a2, and c is lube oil /air <br />ALL RUNS A AND B ARE IN THE TRANSITION SUMP NOT THE LUBE OIL SUMP. <br />