Laserfiche WebLink
SWRCB, January 2002 • 0 Page 4. <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />MX <br />Tank Manufacturer Industry Standard ❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />Pressure Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Piping Run # 5 ANT HONE Piping Run # 5 ANT BTWO <br />Piping Material: fiberglass fiberglass <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />smith <br />smith <br />Piping Diameter: <br />3 " <br />311 <br />Length of Piping Run: <br />71 <br />11211 <br />Product Stored: <br />ANTIFREEZE <br />ANTIFREEZE <br />Method and location of <br />piping -run isolation: <br />ANTIFREEZE <br />ANTIFREEZE <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />starting <br />- - - <br />---- <br />---- <br />Test Start Time: <br />- - - <br />--- <br />-- <br />Initial <br />Initial Reading (I�- <br />Test End Time: <br />- <br />Final Reading (RF <br />- <br />Test Duration: <br />- - - <br />- - - - <br />Change in Reading (RF - R1 }: <br />- - - - <br />- - - <br />Pass/Fail Threshold or <br />Criteria: <br />Test KcstiCl <br />El Pass 0 <br />Fail <br />D Pass 0 Trail <br />❑ <br />I'nss ❑ Fail <br />D <br />Pass � Dail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />RUN al and bl were not tested due to bad }coot in transition piping sump. RUN a2 failed <br />at bad boot in the building, b2 failed at bad boot in the transition piping sump. <br />RUN c failed at bad boot in the building. The product in lines bl and 2 is antifreeze, <br />the product in lines a1, a2, and c is lube oil /air <br />ALL RUNS A AND B ARE IN THE TRANSITION SUMP NOT THE LUBE OIL SUMP. <br />