PERFORMANCE SPECIFICATION <br />SECTION IV TANK INSTALLATION - CONTINUED <br />CONTINUED <br />PART 3 - INSTALLATION - CONTINUED <br />3.9 BACKFILL .PLACEMENT: ONCE TANKS ARE PROPERLY SET IN PLACE, CAREFULY BACKFILL <br />ENTIRE EXCAVATION, HAND SHOVELING AND TAMPING ALONG BOTTOM OF TANKS) SO THEY <br />ARE EVENLY SUPPORTED AROUND BOTTOM. SPECIAL ATTENTION SHALL BE PAID TO BOTTOM <br />QUARTER POINTS ELIMINATING ANY VOIDS IN FILL AT THESE POINTS. DOT NOT DROP <br />BACKFILL "FROM 'HIGH DISTANCE ONTO TANKS. TAMP AS REQUIRED TO ACHIEVE ACCEPTABLE <br />DENSITY.' <br />3.10 BALLASTING: IF GROUND WATER IS PRESENT, TANKS MAY BE FILLED WITH BALLAST <br />(PRODUCT TO BE STORED IN TANK OR WATER) TO AVOID SHIFTING MOVEMENT, IF WATER <br />IS UTILIZED, COST OF WATER AND REMOVAL SHALL BE CONTRACTOR COST. DO NOT <br />INSTALL SUBMERGIBLE PUMPS IN TANKS FILLED WITH WATER. DO NOT BALLAST TANKS <br />ABOVE LEVEL OF BACKFILL. <br />3.11 PROTECTION: CONTRACTOR SHAI..L BE RESPONSIBLE FOR PROVIDING ADEQUATE PROTECTION <br />FOR TANK EXCAVATION FROM SURFACE WATERS WITH DAMS, BERMS, OR OTHER MEANS <br />PENDING COMPLETION OF INSTALLATION. EXCAVATION SHALL BE MARKED AT ALL TIMES WITH <br />LIGHTED BARRICADES UNTIL INSTALLATION IS COMPLETE. WATER SHALL NO BE ALLOWED <br />TO ACCUMULATE IN EXCAVATION. DEWATER AS REQUIRED TO MAINTAIN EXCAVATION DRY <br />AS POSSIBLE. <br />SECTION V CONCRETE <br />SECTION V CONCRETE - CONTINUED <br />PART 3 - EXECUTION CONTINUED <br />3.5.4 PACING PLACE ALL CONCRETE IN ACCORDANCE WITH AGI 614. MINIMUM CONCRETET <br />E <br />COVER OVER REINFORCEMENT SHALL CONFORM TO ACI 318. USE HANDLINGEQUIPMENT <br />AND METHODS TO INSURE A CONTINUOUS FLOW FROM MIXER TO PLACE OF DEPOSIT <br />SPACE, TAMP AND MECHANICALLY VIBRATE FRESHLY PLACED CONCRETE TO COMPACT <br />THOROUGHLY AND ELIMINATE VOIDS. .DO NOT ALLOW ,FREE FALL OF CONCRETE TO <br />EXCEED 5' <br />3.5 FINISHING CONCRETE: <br />3.6.1 SLABS SHALL BE A TRUE PLANE SURFACE WITH NO DEVIATION IN EXCESS OF 1/4" <br />WHEN TESTED WITH A 10' STRAIGHTEDGE AT 3' INTERVALS IN BOTH DIRECTIONS., SCREED <br />AND FLOAT CONCRETE FOR SLAB WITH STRAIGHTEDGES TO ;BRING SURFACE TO <br />REQUIRED FINISHED LEVEL. WOOD FLOAT CONCRETE WHILE STILL GREEN TO A TRUE, <br />EVEN SURFACE WITH NO COARSE AGGREGATE VISIBLE, AFTER SURFACE MOISTURE HAS <br />DISAPPEARED, STEEL TROWEL SURFACE TO A.SMOOTH, EVEN FINISH, FREE FROM <br />BLEMISHES AND TROWEL MARKS. AFTER TROWELING, BRUSH SURFACE OF CONCRETE <br />WITH BRISTLE BROOM TO RESULT IN A MEDIUM, UNIFORM, NONSLIP TEXTURED <br />SURFACE, STROKE CROSSWISE TO LENGTH, <br />3.7 CURING: UTMOST CARE SHALL BE TAKEN TO ACHIEVE A UNIFORM, PORTECTIVE CURE <br />FOR ALL SLABS. DQ NOT USE CALCIUM CHLORIDE, CURING METHODS SHALL CONFORM <br />TO ACI STANDARD 605-99 AND ACI STANDARD 306-66, <br />OF FORM DOT NOT REMOVE FORM" UNTIL CONCRETE HAS ATTAINED <br />PART 1 <br />- GENERAL <br />3.8 REMOVAL �. Q <br />3.2 <br />FORM WORK: BUILD FORMS TO CONFORM TO SHAPE, LINES AND DIMENSIONS OF <br />P <br />SUFFICIENT STRENGTH TO SUPPORT ANY SUPERIMPOSED LOADS. <br />1.1 <br />SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, <br />3,9 PATCHINC: NO PATCHING SHALL OCCUR UNTIL APPROVED BY OWNER, <br />MAINTAIN THEIR SHAPES AND POSITIONS. MAKE FORMS SUFFICIENTLY TIGHT AND <br />EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLEY INCIDENTAL <br />SUBSTANTIALLY ASSEMBLED TO PREVENT BULGING OR LEAKAGE. ASSEMBLE FROMS IN <br />TO CONCRETE <br />3. 1 OTEMPERATURE: <br />PART 2 - PRODUCTS <br />3.10.1 COLD WEATHER: WHEN MEAN DAILY TEMPERATURE OF THE ATMOSPHERE IS LESS <br />SHALL BE IN OR NEAR NEW CONDITION; CLEAN, SMOOTH AND WITHOUT INDENTATIONS OR <br />THAN 40 DEGREES FARENHEIT, MAINTAIN TEMPERATURE OF CONCRETE BETWEEN 50 AND <br />2.1 <br />MATERIALS: <br />70 DEGREES FARENHEIT FOR MINIMUM OF 72 HOURS. <br />2.1.1 <br />AIR ENTRAINING AGENT: ASTM C 260-60-T. "PROTEX" MANUFACTURED BY <br />3.10.2 HOT WEATHER: MAKE ARRANGEMENTS FOR INSTALLATION OF WINDBREAKS, SHADING, <br />PROTEX INDUSTRIES OR APPROVED EQUAL. <br />FOG SPRAY, SPRINKLING, PONDING OR WET COVERING IN ADVANCE OF PLACEMENT. TAKE <br />2.1.2 <br />PROTLAND CEMENT: CONFORM TO ASTM C-150 TYPE 1; TYPE II WHERE WATER <br />SUCH PROTECTIVE MEASURES AS QUICKLY AS. CONCRETE HARDENING AND FINISHING <br />3.3 <br />SOLUBLE SULFATES ARE PRESENT. <br />OPERATIONS -WILL ,ALLOW. <br />2.1.3 <br />AGGREGATES: CONFORM TO ASTM C-33. <br />3.1 TFESTING: CONCRETE TESTS SHALL BE ORDERED AT THE DISCRETION OF THE OWNER'S <br />2.1.4 <br />WATER: SHALL BE CLEAN AND POTABLE. <br />CONSTRUCTION MANAGER. THE OWNER SHALL PAY FOR ALL CONCRETE .TESTING. COMPACTION <br />2.1.5 <br />SAND: CONFORM TO ASTM C-144. <br />TESTS SHALL BE REQUIRED PRIOR TO PLACEMENT'OF ANY CONCRETE ON GRADE. CONTRACT <br />2.1.6 <br />STEEL REINFORCING: CONFORM TO ASTM A-615, GRADE 60 (EXCEPT WHERE NOTED <br />OWNER'S ENGINEERING SERVICES FOR COMPACTION TESTING FESTS: TESTS WILL BE PAID <br />'BY <br />w <br />OTHER WISE) YIELD STRENGTH 60,000 PSI. <br />FOR OWNER, <br />2.1.7 <br />WELDED WIRE FABRIC: CONFORM TO ASTM A-185. <br />3.12THICKNESS: <br />2.1.8 <br />ACCESSORIES INCLUDING BAR SUPPORTS, CHAIR SPACES, ETC., SHALL BE COLD <br />3.12-ISLAB OVER TANKS SHALL BE 8" CONCRETE SLAB WITH #3 REINFORCING BARS AT <br />w <br />DRAWN WIRE WITH HEIGHTS REQUIRED. BAR SUPPORTS FOR CONCRETE RESTING ON EARTH <br />12" O.C. EACH WAY ON 2 1/2 SADDLES. <br />3.4 <br />OR GRAVEL SHALL BE PRECAST BRIQUETTES OR INDIVIDUAL HIGH CHAIRS NO. HCP <br />3.12;21SLAND SLABS SHALL BE 6" CONCRETE. REINFORCEMENT SHALL BE 6/6 X 6/6 <br />WITH WELDED PLATES ON BOTTOM AS MANUFACTURED BY HOHMANN & BERNARD, INC. <br />WELDED WIRE MESH OR #3'S AT 18" C.C.'EACH WAY. REINFORCEMENT SHALL BE <br />2.1.9 <br />FORMS: CLEAN, STRAIGHT LUMBER OF MOISTURE RESISTANT PLYWOOD KNOT <br />2 - 2 1/2" ABOVE BOTTOM OF CONCRETE. <br />HOLES, DEFORMATIONS, ETC., SHALL NOT BE ALLOWED. <br />3.13CANOPY FOOTINGS: CANOPY FOOTINGS SHALL BE INSTALLED BY GENERAL GASOLINE <br />2.1.10 <br />EXPANSION JOINT FILLERS: ASPHALT IMPREGNATED FIBERBOARD CONFORMING TO <br />CONTRACTOR AS PER SHOP DRAWINGS SUPPLIED BY JItnCO CANOPIES. ALL MATERIALS <br />3.5 <br />ASTM D -60-T. USE 1/2" THICK OR AS INDICATED ON DRAWINGS. <br />SHALL BE EQUAL TO OR BETTER THAN SPECIFIED ELSEWHERE IN THIS SECTION. <br />2, <br />1.1 1 CALCIUM CHLORIDE: NOT PERMITTED. <br />3'.14PROTECTION OF ALL CONCRETE SURFACES: IT IS THE RESPONSIBILTY OF THE GENERAL <br />2.2 <br />CONCRETE PROPORTIONS: CONCRETE SUPPLIER SHALL DESIGN CONCRETE MIX AND SHALL <br />CONTRACTOR TO PROTECT ALL CONCRETE SURFACES AGAINST ANY DAMAGE WHATSOEVER, <br />INCLUDING EXCESSIVE LOADING, SHIPPING, CRACKING, STAINING, PAINT SPLATTERS, ETC. <br />GUARANTEE CONCRETE STRENGTH. ALL CONCRETE, UNLESS NOTED OTHERWISE ON DRAWINGS, <br />THE OWNER EXPECTS EXPOSED CONCRETE SURFACES -TO BE CLEAN AND OF UNIFORM COLOR <br />OR REQUIRED OTHERWISE BY CODES, SHALL BE DESIGNED FOR 4,000 PSI STRENGTH AT <br />AND TEXTURE AT COMPLETION OF THE PROJECT. REPLACE ANY CONCRETE DAMAGE DURING <br />28 DAYS WITH NOT LESS THAN .5 1/2 BAGS OF CEMENT PER CUBIC YARD OF CONCRETE. <br />CONSTRUCTION. <br />NOT MORE THAN 6 1/2 GALLONS OF WATER PER BAG OF CEMENT AND NOT MORE THAN A <br />Z <br />4" SLUMP', AIR CONTENTS SHALL RANGE BETWEEN 4% AND 7%. <br />3.15 GRADE CONTROL: ESTABLISH AND MAINTAIN LINES AND GRADES FOR CONCRETE ITEMS <br />in <br />PLACING CONCRETE. <br />THE PREMISES CLEAN AND NEAT AT ALL TIMES <br />PART .S - EXECUTION <br />3.1 <br />GRADE CONTROL: ESTABLISH AND MAINTAIN LINES AND GRADES FOR CONCRETE ITEMS <br />SECTION <br />VI <br />PIPING <br />ART 1 - GENERAL= <br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, <br />EQUIPMENT AND RELATED APPLIANCES REQUIRED IN CONJUNCTION WITH OR INCIDENTAL TO <br />A COMPLETE PLUMBING SYSTEM FORA GASOLINE INSTALLATION. <br />ART 2 -- PRODUCTS <br />2.1 PRODUCT PIPING: PRODUCT PIPING AND FITTINGS SHALL BE,ENVIROFLEX FLEXIBLE <br />DOUBLE PIPING AS MANUFACTURED' BY TOTAL CONTAINMENT, INC. <br />2. 1.1 ONLY TOTAL CONTAINMENT, INC. SUMP/RISERS AND DISPENSERS SHALL BE <br />UTILIZED SO AS TO PROVIDE ACCESS TO ALL PRIMARY AND SECONDARY PIPE FITTINGS. <br />2.2 VENT PIPING: PIPING SHALL BE 2" FIBERGLASS PIPE. VENT LINE' RISERS SHALL BE GALVANIVED <br />PIPE AND EXTEND 4' ABOVE ADJACENT STRUCTURE OR 12'-0" ABOVE FINISHED GRADE. VENT <br />LINE RISERS SHALL NOT BE INSTALLED ON BUILDING UNLESS APPROVED IN' WRITING. <br />2.3 STAGE II VAPOR RECOVER PIPING: PIPING SHALL BE FIBERGLASS (RED THREAD 11 <br />AMERON OR EQUAL), PIPING MUST SLOPE 1/8" PER FOOT MINIMUM FROM DISPENSER <br />ISLAND TO TANK, <br />2.4 BACKFILL ALL MATERIAL SHALL COMPLY WITH SPECIFICATIONS FOR APPROVED MATERIAL <br />AND AS PER MAUFACTURER'S SPECIFICATIONS: <br />ART' 3 - INSTALLATION <br />3.1 ALL PRODUCT PIPING AND SPECIALTIES SHALL BE INSTALLED IN STRICT ACCORDANCE <br />WITH THE MANUFACTURER'S INSTRUCTIONS AND STATE AND LOCAL CODES, <br />3.2 THE DRAWINGS ARE DIAGRAMMATIC AND THE FINAL ARRANGEMENT OF THE WORK SHALL <br />SUIT FIELD CONDITIONS, THE CHARACTERSITICS OF THE MATERIALS USED, AND THE <br />INSTRUCTIONS OF -THE CONSTRUCTION MANAGER VERIFY ALL DIMENSIONS IN THE FIELD, <br />ACCESS AND CLEARANCES MUST BE PROVIDED AND MAINTAINED FOR THE PROPER OPEATION, <br />MAINTENANCE, SERVICE AND. REPAIR OF THE WORK. <br />3.3 LOCATE, IDENTIFY AND MARK EXISTING UNDERGROUND UTILITIES IN THE AREA OF WORK <br />BEFORE -STARTING" EARTHWORK OPERATIONS, IF UTILITIES ARE TO REMAIN IN PLACE <br />PROVIDE ADEQUATE MEANS OF PROTECTION DURING EARTHWORK PROCEDURES. <br />3.4 SHOULD UNCHARTED OR INCORRECTLY CHARTED PIPING OROTHERUTILITIES BE <br />ENCOUNTERED DURING EXCAVATION,' CONSULT THE CONSTRUCTION MANAGER IMMEDIATELY FOR <br />DIRECTIONS AS TO PROCEDURE. COOPERATE WITH THE OWNER AND PUBLIC AND PRIVATE <br />UTILITY COMPANIES IN KEEPING THEIR RESPECTIVE SERVICES- IN STAISFATORY CONDITION. <br />5.5 VERTICAL RISERS FROM TANKS FOR ALL FILL. PIPES, VAPOR RECOVERY ADAPTERS AND <br />AUTO GAUGING ADAPTATIONS, SHALT_ BE A 4" DIAMETER PIPE, <br />SECTION VI PIPING - CONTINUED <br />PART 3 INSTALLATION - CONTINUED <br />3.6 DO NOT INTERRUPT EXISTING UTILITIES SERVING FACILITIES OCCUPIED AND USED BY <br />THE OWNER OR OTHERS, EXCEPT WHEN PERMITTED IN WRITING BY THE CONSTRUCTION <br />MANAGER, AND THE ONLY AFTER ACCEPTABLE TEMPORARY UTILITY SERVICE HAS BEEN <br />PROVIDED, <br />3.7 CONVEY WATER REMOVED FROM EXCAVATIONS AND RAIN WATER TO COLLECTING OR <br />RUN-OFF AREA. NOT E DO 0 USE TRENCH EXCAVATIONS FOR SITE UTILITIES AS TEMPORARY <br />DRAINAGE DITCHES. REMOVE ALL TRASH, DEBRIS AND FOREIGN MATERIAL FROM TRENCHES <br />PRIOR TO PLACING PIPING MATERIAL. <br />3.8 ALL PRODUCT, VAPOR RECOVERY AND VENT LINES SHALL SLOPE UP FROM TANKS A <br />MINIMUM OF 2" IN 8' (1/8" /FT) WITH NO SAG OR TRAPS. LINES SHALL BE IN TRENCHES <br />WITH A MINIMUM OF 6" OF BACKFILL MATERIAL ON ALL SIDES, HORIZONTAL AND VERITCAL. <br />3.9 SUBMERGED PUMP, FILL PIPE, AUTO GAUGING ADAPTORS AND VAPOR RECOVERY ADAPTOR <br />SHALL BE LOCATED AT TANK OPENINGS AS SHOWN ON DRAWINGS. <br />3.1ORLL PIPE SHALL HAVE OVERSPILL CONTAINMENT SYSTEM INSTALLED AS SHOWN ON <br />DRAWINGS. <br />3.1 1 FILL PIPE SHALL HAVE SUBMERGED FILL TUBE. FILL PIPE AND VAPOR RECOVERY RISER <br />SHALL BE CUT TO THE PROPER LENGTH SO THAT FINISHED HUB HEIGHT WILL BE WITHIN <br />5" (+ OR - 1") OF THE TOP OF THE MANHOLE. <br />3.120VERFILL PREVENTION DEVICES SHALL BE INSTALLED AS SHOWN IN DRAWINGS. <br />3.13REMOTE PUMP SHEAR VALVES SHALL BE INSTALLED ON THE PRODUCT LINES UNDER <br />EACH DISPENSER AND SECURED TO THE ISLAND PUMP BOX. THESE VALVES MIDST BE <br />INSTALLED WITH THE SHEAR SECTION AT 1" TO 1/4" BELOW THE TOP OF THE ISLAND. <br />3.14AFTER ALL PIPING IS COMPLETE AND PRIOR -TO BACKFILLING, ALL PIPING INCLUDING <br />VENT LINES SHALL BE ISOLATED FROM THE TANK AND TESTED PER MANUFACTURER'S <br />TESTING INSTRUCTIONS. <br />3.151E SUBMERGED, PUMP RISER IS TO BE LENGTHENED, THE PROPER 4" THINWALL RISER <br />AS PRODUCED BY MANUFACTURER SHALL BE USED. <br />3.16ALL VALVES AND PRODUCT HANDLING EQUIPMENT SHALL BE AS SHOWN ON EQUIPMENT <br />LST. REFER TO LIST OF MATERIALS SUPPLIED BY OWNER. <br />3,170BSERVATION WELLS WHEN REQUIRED SHALL BE INSTALLED. WELLS ARE TO BE <br />POSITIONED IN EXCAVATION HOLE PRIOR TO PLACING BEDDING MATERIAL AND SUPPORTED <br />TO REMAIN VERTICAL DURING BACKFILL OPERATIONS. BOTTOM OF OBSERVATION WELL(S) <br />SHALL BE 12" MINIMUM BELOW THE BOTTOM OF 'TANK EXCAVATION PIT. TOP OF PIPE TO <br />TERMINATE IN 12" DIAMETER OBSERVATION BOX. SLOTTED SAMPLE WELL MATERIAL SHALL <br />BE FURNISHED BY CONTRACTOR. <br />3.18CODES THE NEPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, LATEST EDITION, <br />IS BY REFERENCE MADE A PART OF THIS SPECIFICATION. SAID CODE SHALL DICTATE <br />MINIMUM ACCEPTABLE STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL <br />GOVERNING AUTHORITIES DICTATE HIGHER OR MORE STRINGENT REQUIREMENTS WHICH <br />SHALL TAKE PRECEDENCE. <br />3.19START-UP: PRIOR TO START-UP AND CHECK-OUT OF SYSTEM, PRODUCT LINES <br />SHALL PASS HYDROSTATIC LINE TEST. ALL SITE IMPROVEMENTS. INCLUDING PAVEMENTS <br />AND UTILITIES, SHALL BE COMPLETED PRIOR TO THIS TEST. <br />3.20 INSPECTIONS: PLUMBING INSPECTION SHALL BE PERFORMED BY SOUTHLAND <br />APPOINTED REPRESENTATIVE, <br />3.21 CLEAN-UP: CLEAN -IJP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION, <br />KEEPING THE PREMISES CLEAN AND NEAT AT ALL TIMES. <br />SECTION VII ELECTRICAL WORK <br />PART 1 - GENERAL <br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, <br />EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL <br />TO THE FURNISHING AND INSTALLATION OF COMPLETE ELECTRICAL WORK INCLUDING: <br />1 .1 .1 ELECTRICAL SERVICE AND DISTRIBUTION SYSTEM, INCLUDING CONDUITS, PANELBOARD <br />OUTLET BOXES, WIRING, SWITCHES, OUTLETS, ETC. <br />1.1.2CONDUIT AND WIRING SYSTEM FOR INTERCOM. <br />1.1.3WIRING SYSTEM TO SERVE ALL ELECTRIC -USING DEVICES, LIGHTING FIXTURES, <br />PUMPS, CONTROL EQUIPMENT, DISPENSERS, DEVICES AND OTHER CURRENT CONSUMING <br />EQUIPMENT. <br />1.1.4POWER AND CONTROL WIRING WITH FINAL CONNECTIONS TO ALL EQUIPMENT. <br />1.1.5ALL CONDUITS, CONNECTIONS, WIRE AND STUB -OUTS FOR FASCIA SIGHS) <br />(WHEN SHOWN), CANOPY LIGHTS, PRICE SIGN(S) AND CANOPY MOUNTED FLOOD LIGHTS. <br />1.1.6CONDUITS AS MAY BE SHOWN FOR "FUTURE EQUIPMENT' ON DRAWINGS. <br />1.1.7ALL TRENCHING, EXCAVATIONS AND BACKFILL AS REQUIRED IN CONJUNCTION <br />WITH ELECTRICAL WORK. <br />1.1.81NCIDENTAL ITEMS NOT INDICATED ON THE DRAWINGS OR MENTIONED IN THE <br />SPECIFICATIONS, BUT WHICH ARE REQUIRED TO PROVIDE COMPLETE ELECTRICAL <br />SYSTEMS IN CONFORMANCE WITH REQUIREMENTS OF LOCAL CODES AND ORDINANCES <br />AND THE NATIONAL ELECTRIC CODE. <br />1.2 CODES AND REGULATIONS: COMPLY WITH LATEST REQUIREMENTS OF LOCAL UTILITY <br />COMPANY, LOCAL, STATE, OSHA, NATIONAL ELECTRIC CODES, NATIONAL FIRE PROTECTIVE <br />ASSOCIATION AND LOCAL ELECTRICAL INSPECTION AUTHORITY. REPORT TO OWNER <br />IMMEDIATELEY ANY DISCREPANCIES BETWEEN DRAWINGS AND CODES OR TO BE HELD <br />RESPONSIBLE FOR COMPLIANCE TO THESE CODES AND REGULATIONS. PROVIDE <br />INSTALLATION SUPERIOR TO CODE WHERE SO INDICATED ON DRAWINGS AND, SPECIFIED <br />HEREIN. <br />1.3 PERMITS, FEES, TAXES: ARRANGE AND PAY FOR ALL NECESSARY PERMITS, FEES, <br />AND TAXES. <br />1.4 PROGRESS OF WORK: SCHEDULE WORK WITH THAT OF OTHER TRADES AND IN RELATION <br />TO ENTIRE INSTALLATION SO THAT THE 'ENTIRE PROJECT CAN BE COMPLETED PER <br />CONSTRUCTION SCHEDULE, <br />1.5 CUTTING AND REPAIRING: PROVIDE ALL CUTTING, CHANNELING, PATCHING, ETC. AS <br />NECESSARY FOR ELECTRICAL WORK UNDER DIRECTION OF GENERAL CONTRACTOR. WORK <br />FOUND' TO BE DEFECTIVE OR INCORRECTLY INSTALLED IS TO BE CORRECTED AT THE <br />DIRECTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. MAKE REPAIR WORK <br />TO BE DONE BY SKILLED CRAFTSMEN IN TRADES INVOLVED, BUT PAID FOR THE <br />ELECTRICAL SUBCONTRACTOR. <br />Vl <br />z <br />0 <br />UU <br />U <br />a <br />N <br />BY MEANS OF LINE AND GRADE STAKES AND SCREEDS. <br />- <br />3.2 <br />FORM WORK: BUILD FORMS TO CONFORM TO SHAPE, LINES AND DIMENSIONS OF <br />P <br />CONCRETE MEMBERS. BRACE AND SECURE TO WITHSTAND PLACING OF CONCRETE AND <br />MAINTAIN THEIR SHAPES AND POSITIONS. MAKE FORMS SUFFICIENTLY TIGHT AND <br />SUBSTANTIALLY ASSEMBLED TO PREVENT BULGING OR LEAKAGE. ASSEMBLE FROMS IN <br />SUCH A MANNER TO FACILITATE THEIR REMOVAL WITHOUT DAMAGE TO CONCRETE, FORMS <br />P <br />SHALL BE IN OR NEAR NEW CONDITION; CLEAN, SMOOTH AND WITHOUT INDENTATIONS OR <br />� <br />a <br />BENDS. INSTALL SLEEVES, MANHOLES, CAPS, BOXES AND POSTS IN PROPER LOCATIONS <br />AND HEIGHTS, EXPANSION JOINTS SHALL CONSIST OF FILLER STRIPS INSTALLED WITH <br />TOP AT ELEVATIONS OF FINISHED CONCRETE. NEATLY FINISH EDGES OF EXPOSED CONCRETE <br />a <br />ALONG JOINTS WITH A SLIGHTLY ROUNDED EDGING TOOL. <br />w <br />3.3 <br />REINFORCEMENT: FURNISH AND INSTALL ALL REINFORCING STEEL INDICATED ON DRAWING <br />METAL REINFORCEMENT AT THE TIME CONCRETE IS PLACED, SHALL BE FREE FROM <br />COATINGS WHICH WILL DESTROY OR REDUCE THE BOND. METAL REINFORCEMENT SHALL BE <br />a <br />z <br />STORED SO AS TO PREVENT FREEZING FOR A MINIMUM OF 48 HOURS PRIOR TO PLACEMENT <br />ALL REINFORCEMENT SHALL BE FABRICATED AND PLACED IN ACCORDANCE WITH STANDARDS <br />w <br />OF ACL METAL REINFORCEMENT SHALL BE ACCURATELY PLACED AND ADEQUATELY SECURED <br />0 <br />J <br />IN POSITION. SPLICES IN ADJACENT BARS SHALL BE LAPPED 36 DIAMETERS AT CORNERS <br />AND SPLICES. ADJACENT SHEETS OF WIRE MESH SHALL BE LAPPED AT LEASE 6" AND <br />w <br />SECURELY WIRED. SUPPORT ALL REINFORCEMENT WITH SADDLES AS REQUIRED. <br />U <br />3.4 <br />MIXING AND TRANSPORTING CONCRETE: CONCRETE SHALL BE .READY MIXED AND SHALL <br />P <br />MEET REQUIREMENTS OF ASTM C-94 FOR MIXING AND DELIVERY. FURNISH DUPLICATE <br />z <br />Q <br />DELIVERY TICKETS OF EACH TRUCK LOAD TO OWNER'S LOCAL CONSTRUCTION OFFICE WHEN <br />REQUIRED. TICKETS SHALL SPECIFY STRENGTH, SLUMP, AGGREGATE SIZES, AIR <br />w <br />ENTRAINMENT (IF ANY) AND BRAND OF CEMENT. NOTE AMOUNT OF WATER ADDED AT JOB. <br />3.5 <br />PLACING CONCRETE: <br />3.5.1 NOTIFICATION: THE CONTRACTOR SHALL NOTIFY THE OWNER'S LOCAL CONSTRUCTION <br />OFFICE AT LEAST 48 HOURS BEFORE PLACING ANY CONCRETE. THE CONTRACTOR <br />SHALL NOTIFY ALL TRADES AFFECTED BY CONCRETE PLACEMENT AT LEAST 24 HOURS <br />BEFORE PLACING ANY -CONCRETE IN ORDER THAT TRADES AFFECTED MY INSTALL <br />REQUIRED BLOCKING, SLEEVED, POCKETS, ETC. <br />w <br />3,5.2 PROTECTION: PROTECT ALL WORK OF OTHER TRADES AS REQUIRED. <br />Z <br />3.5.3WETTING: THOROUGHLY WET FORMS AND DAMPEN SAND CUSHIONS BEFORE <br />� <br />in <br />PLACING CONCRETE. <br />ART 1 - GENERAL= <br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, <br />EQUIPMENT AND RELATED APPLIANCES REQUIRED IN CONJUNCTION WITH OR INCIDENTAL TO <br />A COMPLETE PLUMBING SYSTEM FORA GASOLINE INSTALLATION. <br />ART 2 -- PRODUCTS <br />2.1 PRODUCT PIPING: PRODUCT PIPING AND FITTINGS SHALL BE,ENVIROFLEX FLEXIBLE <br />DOUBLE PIPING AS MANUFACTURED' BY TOTAL CONTAINMENT, INC. <br />2. 1.1 ONLY TOTAL CONTAINMENT, INC. SUMP/RISERS AND DISPENSERS SHALL BE <br />UTILIZED SO AS TO PROVIDE ACCESS TO ALL PRIMARY AND SECONDARY PIPE FITTINGS. <br />2.2 VENT PIPING: PIPING SHALL BE 2" FIBERGLASS PIPE. VENT LINE' RISERS SHALL BE GALVANIVED <br />PIPE AND EXTEND 4' ABOVE ADJACENT STRUCTURE OR 12'-0" ABOVE FINISHED GRADE. VENT <br />LINE RISERS SHALL NOT BE INSTALLED ON BUILDING UNLESS APPROVED IN' WRITING. <br />2.3 STAGE II VAPOR RECOVER PIPING: PIPING SHALL BE FIBERGLASS (RED THREAD 11 <br />AMERON OR EQUAL), PIPING MUST SLOPE 1/8" PER FOOT MINIMUM FROM DISPENSER <br />ISLAND TO TANK, <br />2.4 BACKFILL ALL MATERIAL SHALL COMPLY WITH SPECIFICATIONS FOR APPROVED MATERIAL <br />AND AS PER MAUFACTURER'S SPECIFICATIONS: <br />ART' 3 - INSTALLATION <br />3.1 ALL PRODUCT PIPING AND SPECIALTIES SHALL BE INSTALLED IN STRICT ACCORDANCE <br />WITH THE MANUFACTURER'S INSTRUCTIONS AND STATE AND LOCAL CODES, <br />3.2 THE DRAWINGS ARE DIAGRAMMATIC AND THE FINAL ARRANGEMENT OF THE WORK SHALL <br />SUIT FIELD CONDITIONS, THE CHARACTERSITICS OF THE MATERIALS USED, AND THE <br />INSTRUCTIONS OF -THE CONSTRUCTION MANAGER VERIFY ALL DIMENSIONS IN THE FIELD, <br />ACCESS AND CLEARANCES MUST BE PROVIDED AND MAINTAINED FOR THE PROPER OPEATION, <br />MAINTENANCE, SERVICE AND. REPAIR OF THE WORK. <br />3.3 LOCATE, IDENTIFY AND MARK EXISTING UNDERGROUND UTILITIES IN THE AREA OF WORK <br />BEFORE -STARTING" EARTHWORK OPERATIONS, IF UTILITIES ARE TO REMAIN IN PLACE <br />PROVIDE ADEQUATE MEANS OF PROTECTION DURING EARTHWORK PROCEDURES. <br />3.4 SHOULD UNCHARTED OR INCORRECTLY CHARTED PIPING OROTHERUTILITIES BE <br />ENCOUNTERED DURING EXCAVATION,' CONSULT THE CONSTRUCTION MANAGER IMMEDIATELY FOR <br />DIRECTIONS AS TO PROCEDURE. COOPERATE WITH THE OWNER AND PUBLIC AND PRIVATE <br />UTILITY COMPANIES IN KEEPING THEIR RESPECTIVE SERVICES- IN STAISFATORY CONDITION. <br />5.5 VERTICAL RISERS FROM TANKS FOR ALL FILL. PIPES, VAPOR RECOVERY ADAPTERS AND <br />AUTO GAUGING ADAPTATIONS, SHALT_ BE A 4" DIAMETER PIPE, <br />SECTION VI PIPING - CONTINUED <br />PART 3 INSTALLATION - CONTINUED <br />3.6 DO NOT INTERRUPT EXISTING UTILITIES SERVING FACILITIES OCCUPIED AND USED BY <br />THE OWNER OR OTHERS, EXCEPT WHEN PERMITTED IN WRITING BY THE CONSTRUCTION <br />MANAGER, AND THE ONLY AFTER ACCEPTABLE TEMPORARY UTILITY SERVICE HAS BEEN <br />PROVIDED, <br />3.7 CONVEY WATER REMOVED FROM EXCAVATIONS AND RAIN WATER TO COLLECTING OR <br />RUN-OFF AREA. NOT E DO 0 USE TRENCH EXCAVATIONS FOR SITE UTILITIES AS TEMPORARY <br />DRAINAGE DITCHES. REMOVE ALL TRASH, DEBRIS AND FOREIGN MATERIAL FROM TRENCHES <br />PRIOR TO PLACING PIPING MATERIAL. <br />3.8 ALL PRODUCT, VAPOR RECOVERY AND VENT LINES SHALL SLOPE UP FROM TANKS A <br />MINIMUM OF 2" IN 8' (1/8" /FT) WITH NO SAG OR TRAPS. LINES SHALL BE IN TRENCHES <br />WITH A MINIMUM OF 6" OF BACKFILL MATERIAL ON ALL SIDES, HORIZONTAL AND VERITCAL. <br />3.9 SUBMERGED PUMP, FILL PIPE, AUTO GAUGING ADAPTORS AND VAPOR RECOVERY ADAPTOR <br />SHALL BE LOCATED AT TANK OPENINGS AS SHOWN ON DRAWINGS. <br />3.1ORLL PIPE SHALL HAVE OVERSPILL CONTAINMENT SYSTEM INSTALLED AS SHOWN ON <br />DRAWINGS. <br />3.1 1 FILL PIPE SHALL HAVE SUBMERGED FILL TUBE. FILL PIPE AND VAPOR RECOVERY RISER <br />SHALL BE CUT TO THE PROPER LENGTH SO THAT FINISHED HUB HEIGHT WILL BE WITHIN <br />5" (+ OR - 1") OF THE TOP OF THE MANHOLE. <br />3.120VERFILL PREVENTION DEVICES SHALL BE INSTALLED AS SHOWN IN DRAWINGS. <br />3.13REMOTE PUMP SHEAR VALVES SHALL BE INSTALLED ON THE PRODUCT LINES UNDER <br />EACH DISPENSER AND SECURED TO THE ISLAND PUMP BOX. THESE VALVES MIDST BE <br />INSTALLED WITH THE SHEAR SECTION AT 1" TO 1/4" BELOW THE TOP OF THE ISLAND. <br />3.14AFTER ALL PIPING IS COMPLETE AND PRIOR -TO BACKFILLING, ALL PIPING INCLUDING <br />VENT LINES SHALL BE ISOLATED FROM THE TANK AND TESTED PER MANUFACTURER'S <br />TESTING INSTRUCTIONS. <br />3.151E SUBMERGED, PUMP RISER IS TO BE LENGTHENED, THE PROPER 4" THINWALL RISER <br />AS PRODUCED BY MANUFACTURER SHALL BE USED. <br />3.16ALL VALVES AND PRODUCT HANDLING EQUIPMENT SHALL BE AS SHOWN ON EQUIPMENT <br />LST. REFER TO LIST OF MATERIALS SUPPLIED BY OWNER. <br />3,170BSERVATION WELLS WHEN REQUIRED SHALL BE INSTALLED. WELLS ARE TO BE <br />POSITIONED IN EXCAVATION HOLE PRIOR TO PLACING BEDDING MATERIAL AND SUPPORTED <br />TO REMAIN VERTICAL DURING BACKFILL OPERATIONS. BOTTOM OF OBSERVATION WELL(S) <br />SHALL BE 12" MINIMUM BELOW THE BOTTOM OF 'TANK EXCAVATION PIT. TOP OF PIPE TO <br />TERMINATE IN 12" DIAMETER OBSERVATION BOX. SLOTTED SAMPLE WELL MATERIAL SHALL <br />BE FURNISHED BY CONTRACTOR. <br />3.18CODES THE NEPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, LATEST EDITION, <br />IS BY REFERENCE MADE A PART OF THIS SPECIFICATION. SAID CODE SHALL DICTATE <br />MINIMUM ACCEPTABLE STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL <br />GOVERNING AUTHORITIES DICTATE HIGHER OR MORE STRINGENT REQUIREMENTS WHICH <br />SHALL TAKE PRECEDENCE. <br />3.19START-UP: PRIOR TO START-UP AND CHECK-OUT OF SYSTEM, PRODUCT LINES <br />SHALL PASS HYDROSTATIC LINE TEST. ALL SITE IMPROVEMENTS. INCLUDING PAVEMENTS <br />AND UTILITIES, SHALL BE COMPLETED PRIOR TO THIS TEST. <br />3.20 INSPECTIONS: PLUMBING INSPECTION SHALL BE PERFORMED BY SOUTHLAND <br />APPOINTED REPRESENTATIVE, <br />3.21 CLEAN-UP: CLEAN -IJP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION, <br />KEEPING THE PREMISES CLEAN AND NEAT AT ALL TIMES. <br />SECTION VII ELECTRICAL WORK <br />PART 1 - GENERAL <br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, <br />EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL <br />TO THE FURNISHING AND INSTALLATION OF COMPLETE ELECTRICAL WORK INCLUDING: <br />1 .1 .1 ELECTRICAL SERVICE AND DISTRIBUTION SYSTEM, INCLUDING CONDUITS, PANELBOARD <br />OUTLET BOXES, WIRING, SWITCHES, OUTLETS, ETC. <br />1.1.2CONDUIT AND WIRING SYSTEM FOR INTERCOM. <br />1.1.3WIRING SYSTEM TO SERVE ALL ELECTRIC -USING DEVICES, LIGHTING FIXTURES, <br />PUMPS, CONTROL EQUIPMENT, DISPENSERS, DEVICES AND OTHER CURRENT CONSUMING <br />EQUIPMENT. <br />1.1.4POWER AND CONTROL WIRING WITH FINAL CONNECTIONS TO ALL EQUIPMENT. <br />1.1.5ALL CONDUITS, CONNECTIONS, WIRE AND STUB -OUTS FOR FASCIA SIGHS) <br />(WHEN SHOWN), CANOPY LIGHTS, PRICE SIGN(S) AND CANOPY MOUNTED FLOOD LIGHTS. <br />1.1.6CONDUITS AS MAY BE SHOWN FOR "FUTURE EQUIPMENT' ON DRAWINGS. <br />1.1.7ALL TRENCHING, EXCAVATIONS AND BACKFILL AS REQUIRED IN CONJUNCTION <br />WITH ELECTRICAL WORK. <br />1.1.81NCIDENTAL ITEMS NOT INDICATED ON THE DRAWINGS OR MENTIONED IN THE <br />SPECIFICATIONS, BUT WHICH ARE REQUIRED TO PROVIDE COMPLETE ELECTRICAL <br />SYSTEMS IN CONFORMANCE WITH REQUIREMENTS OF LOCAL CODES AND ORDINANCES <br />AND THE NATIONAL ELECTRIC CODE. <br />1.2 CODES AND REGULATIONS: COMPLY WITH LATEST REQUIREMENTS OF LOCAL UTILITY <br />COMPANY, LOCAL, STATE, OSHA, NATIONAL ELECTRIC CODES, NATIONAL FIRE PROTECTIVE <br />ASSOCIATION AND LOCAL ELECTRICAL INSPECTION AUTHORITY. REPORT TO OWNER <br />IMMEDIATELEY ANY DISCREPANCIES BETWEEN DRAWINGS AND CODES OR TO BE HELD <br />RESPONSIBLE FOR COMPLIANCE TO THESE CODES AND REGULATIONS. PROVIDE <br />INSTALLATION SUPERIOR TO CODE WHERE SO INDICATED ON DRAWINGS AND, SPECIFIED <br />HEREIN. <br />1.3 PERMITS, FEES, TAXES: ARRANGE AND PAY FOR ALL NECESSARY PERMITS, FEES, <br />AND TAXES. <br />1.4 PROGRESS OF WORK: SCHEDULE WORK WITH THAT OF OTHER TRADES AND IN RELATION <br />TO ENTIRE INSTALLATION SO THAT THE 'ENTIRE PROJECT CAN BE COMPLETED PER <br />CONSTRUCTION SCHEDULE, <br />1.5 CUTTING AND REPAIRING: PROVIDE ALL CUTTING, CHANNELING, PATCHING, ETC. AS <br />NECESSARY FOR ELECTRICAL WORK UNDER DIRECTION OF GENERAL CONTRACTOR. WORK <br />FOUND' TO BE DEFECTIVE OR INCORRECTLY INSTALLED IS TO BE CORRECTED AT THE <br />DIRECTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. MAKE REPAIR WORK <br />TO BE DONE BY SKILLED CRAFTSMEN IN TRADES INVOLVED, BUT PAID FOR THE <br />ELECTRICAL SUBCONTRACTOR. <br />Vl <br />z <br />0 <br />UU <br />U <br />a <br />N <br />DATE: 08SEP97 <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: CL <br />DRAWING <br />FSP -3 <br />0 <br />m <br />0 <br />o <br />� <br />� <br />a <br />F <br />a <br />w <br />a <br />0 <br />a <br />z <br />w <br />0 <br />J <br />w <br />w <br />J <br />U <br />W <br />z <br />Q <br />U <br />w <br />J <br />a <br />} <br />w <br />Z <br />0 <br />c� <br />� <br />in <br />DATE: 08SEP97 <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: CL <br />DRAWING <br />FSP -3 <br />