My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:46 AM
Creation date
11/5/2018 11:18:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 Page 10 of 11 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑vacuum ❑Hydrostatic <br /> ®Other(Specify) I hour leak test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box# 87-1 Fill Spill Box# 87-2 Fill Spill Box#91 Fill Spill Box#Additive <br /> Fill <br /> Bucket Diameter&Brand: 12" 12" 12" 12" <br /> Bucket Depth: 13.5" 13" 14.5" 15" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 9:59am 9:59am 9:59am 9:59am <br /> Initial Reading(Rj): 13 1/8" 12 3/8" 14 1/8" 14" <br /> Test End Time: 10:59am 10:59am 10:59am 10:59am <br /> Final Reading(RF): 13 1/8" 12 3/8" 14 1/8" 14" <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Rj): 0 0 0 0 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑Fail ® Pass ❑Fail I ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> I hour leak test conducted <br />
The URL can be used to link to this page
Your browser does not support the video tag.