Laserfiche WebLink
• 0 Page 10 of 11 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑vacuum ❑Hydrostatic <br /> ®Other(Specify) I hour leak test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box# 87-1 Fill Spill Box# 87-2 Fill Spill Box#91 Fill Spill Box#Additive <br /> Fill <br /> Bucket Diameter&Brand: 12" 12" 12" 12" <br /> Bucket Depth: 13.5" 13" 14.5" 15" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 9:59am 9:59am 9:59am 9:59am <br /> Initial Reading(Rj): 13 1/8" 12 3/8" 14 1/8" 14" <br /> Test End Time: 10:59am 10:59am 10:59am 10:59am <br /> Final Reading(RF): 13 1/8" 12 3/8" 14 1/8" 14" <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Rj): 0 0 0 0 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑Fail ® Pass ❑Fail I ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> I hour leak test conducted <br />