Laserfiche WebLink
9. SPILL/OVERFILL CONTAINMENT BOXES �-- <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufachuer ®Industry Standard ❑Profess'o <br /> ❑Other((Specify)` <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Inco,TS-STS Sump Test System Equipment Resolution: +/-0.002" <br /> SpIII Bos# 87 Tl FB Spi6 Box# 87 Tl VB Spi6 Box# 87 T2 FB Spill Boa#g7 T2 VB <br /> 7Bucket <br /> et Diameter. 12" 12" <br /> Depth: 12" 12„ <br /> time between applyingure/vacuum/water and test:tart Time:Reading(Rr): 6.6211 1.4893 1.3587 <br /> 5.706 <br /> Test End Time: 11:31 AM 12:25 PM 11:54 AM 11:31 AM <br /> Final Reading(RF): 6.6205 1.4896 1.3597 5.7062 <br /> Test Duration: 15 min. 13 min. 15 min. 15 min. <br /> Change in Reading(RF-P4): -0.0006 0.0003 0.0010 0.0002 <br /> Pass/Fail Threshold or <br /> Criteria: +1-0.002" +/-0.002" +/-0.002" +1-0.00211 <br /> Test Result: Pass Pass Pass Pass <br /> Comments—(include information on repairs"rade prior to testing and recommended ollou up orfailed tests) <br />