Laserfiche WebLink
ARCO #4932, Stockton <br />Tank Entry <br />Containment Solutions will inspect the tank and report their findings to the local <br />agencies upon exit of the tank. A formal report will be submitted at a later date. <br />Scott Co. will provide a third party engineer to enter the tank once Containment <br />Solutions completes their entry. This engineer will also provide any additional <br />status report on the structural integrity and conditions of the Single Wall <br />Fiberglass Underground Storage Tank. <br />We have attached a resume for Keri M. Howell, P.E. who we will be using for <br />third party engineering services. <br />Containment Solutions will install striker plates under all tank openings once the <br />inspection work is complete. A manway will be installed at tank top were the <br />entry holes were cut for any future access. Containment Solutions will perform a <br />nitrogen test on each system prior to the introduction of any product. <br />At the completion of the project, a precision tank and line test will be performed <br />on the tanks. All data will then be submitted to the Health Department to review. <br />Please feel free to contact me with any questions or should you need additional <br />information I can be reached at (510) 895-2333 ext. 385. <br />Very/Truly Yours, <br />�,CO T Cp. OF CALIFORNIA <br />Paul'era <br />Environmental Project Manager <br />g:Scottc jobs; tank, Ipf021799-4932 <br />