Laserfiche WebLink
M <br />L <br />e <br />Nr <br />a <br />0 <br />�t <br />a <br />0 0 <br />H) <br />m <br />I <br />M <br />� <br />ILs1 <br />71 <br />to <br />I5 <br />M <br />rT <br />17 <br />2 3 1 4 5 <br />6 e as <br />v n m N <br />IK 1p 16 n <br />1 <br />01 GENERAL REQUIREMENTS <br />Suction System - Open check valve, pull poppet and drain product from line into tank. <br />ALTERNATIVE BACKFILL MATERIALS: Defined as any material not meeting above requirements <br />for <br />SPECIAL FITTINGS; The shut-off valve ("Shear' or "Safety" volve) at the base of the product pump <br />Do not replace poppet. Reinstall cover on valve. <br />approved materials. <br />or dispenser Is secured in position to the stabilizer bar of the dispenser containment box as detailed <br />Pressure System- "Break" pipe at union at remote pump. Drain product into tank or <br />Approval of Company Representative is required prior to use of such material. In certain <br />on the drawings. <br />K <br />yy <br />General Requirements apply to all sections of the specifications as if slated separatery in each <br />separate container. <br />instances, the approval of the tank manufacturer may be required to preserve the tank warranty. <br />Position the valve so that the line test port plug is accessible, <br />These <br />shall obtain such approval. <br />section.Company <br />Avoid spills. Do not allow product to drain into soil Contractor may be held liable if soil <br />PIPE WRAPPING: All underground steel pipe and fittings shall be field primed and wrapped. <br />COMPANY REPRESENTATIVE: The Regional Manager or Representative authorized by him, <br />contamination occurs during tank and line: removal, <br />Alternate materials, if used, must be dry and free of ice and snow. The tank hole sides must be <br />Wrapping material shall be 35 mil polyethylene lope Polyken 930" manufactured by the Kendall <br />hereinafter referred to in these specifications as Company Representative. <br />shored or side sloped to permit entry for compaction and testing. <br />Company (or equal approved by Company Representative). Wrap overlap, shall be one-half width <br />Flush all product, vent and vapor return lines back in tank or separate contoiner(s). (Flushing <br />, <br />of wrapping material. Wrap 1-1/2" and Z fittings with Polyken 900 (2 mils) with a 60% <br />in separate containers can be dumped Into product tanks for storage.) Flush each line with aoverlap. <br />In difficult areas Polyken 931 can be used before wrapping with Polyken 900. Primer <br />STATUS OF COMPANY'S REPRESENTATIVE: Company Representative has authorityr to make <br />minimum of 10 gallons of water. <br />BEDDING OF TANKS: A 12" minimum bed of backfill material is to be placed in the hole, <br />shall be Polyken 927 (above 40' F) or Polyken 919 (above 10' F). <br />oil decisions regarding work performed under this contract. <br />Ismoothed <br />and sloped to allow a tank slope of 1"' in 10' downward toward the fill end prior to <br />Open all openings and flush inside of each lank with a minimum of 200 gallons of water using <br />"wash <br />setting the tank. <br />Exceptions: Do not wrap the union at the remote pump and/or FRP pipe/flex connector <br />high pressure spray equipment with wand to down" the sides and bottom of the tank. <br />"logs" <br />connections. <br />WORK' "INCLUDED: All there, material, utilities and equipment required for full performance and <br />When specified, the hold or tie -down shall be installed prior to be bed material. <br />P 9 <br />completion of work herein specified shown on accompanying n drawings, including procurement <br />Company Representative will arrange fora truck to collect all recovered product (liquid <br />"recovered' "slap" <br />SETTING & BEDDING PIPE: A 2" minimum bed of backfill material o to be placed all piping <br />E <br />P <br />les <br />esso remits, utilities, etc. unless olherwse noted on the pions or <br />for a <br />cocuum <br />and Sludge). Vacuum truck is to return product to at Company facility or <br />Coulton - not plane tanks on concrete slabs, limbers, beams, cradles grout the tanks in wet <br />trenches. Smooth, compact and slope bedding material to allow a slope of 1/4 per foot toward the <br />/ <br />all necessary <br />of and pay ry P <br />payment <br />by Company Representative, <br />g y pp hued oil water separator system. <br />approved ceratin facility with approved / p y <br />he <br />cement. The tank, whether lied down or not, must never be left on the bed without a backfill <br />e <br />tanks. 1/8 " per foot may be used if approved in writing Company Representative. <br />specifications or specified <br />to the top of the tank If there Is any chance of water, 12" or more above the tank bottom, in the <br />The tank must be free from flammable vapors prior to removal. One method is to remove all <br />hole. <br />SEE SECTION. 07 FOR BACKFILL MATERIALS. <br />DOCUMENTS: Drawings and specifications are cooperative. Execute work indicated in one as if <br />tank fixtures, except for the tank vent and place solid carbon dioxide (dry ice) in the tank. A <br />in both. Work not detailed or specified must be some quality and type as work detailed <br />minimum of 1.5 lbs per 100 gallons of tank capacity must be added. Plug. all tank openings <br />Piping sholl be laced on <br />P 9 P prepared bed in such manner as to minimize points at which one pipe <br />indicated <br />or specified. Contractor shall verify all dimensions and conditions on the site. Report at once <br />except the vent and allow the tank to vent. <br />i <br />may cross over another pipe. At points where piping must cross over, a minimum of 2 1/2" must <br />any discrepancies found between drawings, specificotlops and site conditions for adjustment by <br />�3 PRODUCT, VENT r4C VAPOR RECOVERY PIPING <br />separate the pipes. <br />Oompany Representative before starting work in question. Under no circumstances should work <br />Atter took venting, the vapor space shall be tested by placing the combustible gas indicator probe <br />"First <br />In tee started if a discrepancy is discovered after award of Contract. Terms of contract <br />into the fill opening with the drop lube removed. Readings should be taken at the bottom, <br />When piping is placed on the bed, proceed to Test" (below) prior to backfilling trenches, <br />question <br />applyto this work. Contractor to keep a complete set of drawings and specifications and any <br />middle and upper portions of the tank, The tank atmosphere must be 20% or less of the lower <br />in <br />MATERIALS: All fittings, risers, wrapping materials, etc., shall be furnished and installed <br />lemenlol documents on the job at all limes. When the word PROVIDE is used on <br />Supp 1 <br />flammable limit prior to removal. Refer to the probe manufacturer's instructions for testing <br />pipes, <br />b the Contractor. Specific materials noted in thus Ions be <br />CLEANING SOLVENTS! Remove any accumulation or accidental spill of pipe cleaning solvents on <br />drawings <br />drawings in specifications, it shall be taken to mean "Furnish and Install" <br />low oxygen, conditions. <br />s ecHicotion and/or on will <br />Y P P <br />the tank immediately with o clean cloth. After the piping is completed, inspect the <br />or <br />furnished by Company. . <br />sump and other collection pants for piping cleaning solvents. Contractor well be responsible for <br />responsible f <br />k <br />' <br />Prior to removal, all tank openings should be plugged. One plug should have a 1/8" vent hole <br />All to be "fiberglass" in <br />any damage to look resulting from an accumulation of pipe cleaning solvent. <br />LAWS, CODES, ORDINANCES AND REGULATIONS: Laws, Codes, Ordinances and Regulations <br />to prevent excessive pressure buildup, This vent hole must face upward at all limes. <br />pipe runs are of pipe and sized accordance with plans. <br />which apply to this work must be rigidly followed. Determine handling of any variations <br />Flex connectors are to be used at the vent riser base and dispenser base connections. <br />REPAIR OF PIPING: Replace any damaged piping immediately. Repair of piping using field cut <br />between or specifications and governing ordinances, etc., with Company Representative <br />Plug any corrosion caused holes using screwed boiler plugs. Company Representative will Inspect <br />piping <br />holt section of e Is not acceptable. If approved b Company Representative, repair using <br />pipe P Pp Y D Y P 9 <br />plans <br />before starling work. <br />the removed tanks, then release the looks for shipment <br />is to be <br />manufacturer supplied pipe fittings and procedures is acceptable. Repaired pipe requires <br />q <br />Above round vent riser steel e. <br />9 P D <br />complete testing or retest using procedures below, <br />' <br />All U.L. Labels shall be removed and given to the Company Representative. <br />Protect earthwork, trees, etc., from damage and give proper <br />Black iron pipe or fitting shall be used with diesel fuel. Do not use galvanized pipe or fittings <br />SECONDARY CONTAINMENT FITTINGS: Two piece fittings require more adhesive than normal <br />PRECAUTIONS: adjoining property, <br />to owners, Repair any damage to adjoining <br />All tanks must be properly labeled prior to transportation from the site. Transport and disposal <br />with diesel fuel. <br />bell and spigot joints. Two 7/16 wrenches or a variable torque impact wrench is required to <br />written notice of proposed work adjoining property <br />by this operation to satisfaction of Company Representative. Protect completed <br />of the tanks and product lines must be done in accordance with all stale and local regulations. <br />, <br />lighten the fittings. Make sure adhesive fills all gaps between pipe ends and titling sockets. <br />properties caused <br />1. FIBERGLASS PIPE: Pipe and fittings to UL for petroleum and alcohol fuels, non- <br />, <br />work from damage until accepted by Company Representative. <br />Follow any state or local regulations regarding soil samples or inspection of look hole and/or <br />pced <br />metallic, for underground piping of petroleum rodu <br />products. All pipe will have bell and spigot joints. <br />FLEX CONNECTOR BOOTS; Encase all flex connectors when in contact with soil in isolation <br />- - <br />tanks. _ <br />All product piping will have secondary to mnri Vent end--uspeFceser9q- piping do not require <br />on <br />boot. Move the isolation to inspect and test all primary piping and flex connector. <br />MATERIAL: To be new, purchased locally if possible, and of brand herein specified. Brands and <br />If <br />When free is found during any of the removal of underground tanks) or piping <br />secondary containment - - -.- <br />TESTING OF PIPING: Notify the Company Representative, who MUST observe tests, least <br />y <br />grades specified ore approved and Included to establish type and quality requirements. <br />that equal to those specified, <br />product phase <br />system(s), immediately notify the Company Representative. <br />Approved Fiberglass Pipe: <br />oil at <br />24 hours in advance of any tests. Contractor to coordinate testing with local inspectors and <br />Contractor would prefer to substitute brands and grades ore <br />information on substitutions must be submitted to Company Representative prior to <br />Company Representotive. <br />proposed <br />procurement to determine acceptability to Company. <br />EXCAVATIONS: Excavate oil to the depths required b the Ions. or as instructed b Company <br />y P q y P y p Y <br />p deo n_ 3000 t Pipe System <br />Y / P Y <br />Representative. <br />The Contractor is responsible for all tabor, material, and equipment to conduct pressure tests (air <br />Smith Fiberglass, Inc. <br />or hydrostatic) of all product, vent and vapor recovery piping. - <br />SUPERVISION AND COORDINATION: General Contractor is responsible for progress, execution <br />COORDINATION: <br />Ih unexpected water condition or rock is encountered, immediately contact the Company <br />Red, Thread 11 Pipe System <br />of work and is to coordinate and expedite proxcuremenl of materials <br />Representative for instructions before proceeding with the excavation. <br />TESTING DEVIATIONS: Do not deviate from the following testing procedures. Perform alternate <br />and quality <br />and performance of work of respective trades and Subcontractors. General Contractor to have <br />between <br />Adhesives for Primary Product Piping Adhesives for Vent. Vapor, and Secondary Containment Piping <br />testing procedures required by local inspectors after Chevron tests are completed and <br />the some qualified responsible representative who understands and speaks English fluently on the <br />TANK HOLE SIZE IN STABLE SOIL: Size excavation perimeter to allow 24" minimum <br />hole. <br />DS -8014 (Must be Heal Packed) DS -7069 <br />documented, <br />job of all times, including time of final inspection, General Conlractorr is responsible for <br />- tanks and 24" minimum between tank sides and end cops and the wall of the lank <br />-. <br />establishing and maintaining all lines, levels and grades shown on pians or otherwise required. <br />DS -8069 <br />1. FIRST TEST (Prior Back Filling Pipe Trenches): Do not connect piping to tanks, remote <br />- General Contractor to maintain site in accessible condition for other tradfes and contractors. <br />G <br />than 750 IDs/sq <br />Non-melollir fittings are to be those manufactured by the supplier of the pipe being used. <br />pumps er <br />dispensers. Do not seal or install secondary containment fittings until primary piping <br />e - - <br />TANK HOLE SIZE IN UNSTABLE SOIL: Unstable soil is defined as having less <br />test'eor <br />Is tested. <br />F <br />i <br />- <br />!t. cohesion, as calculated from an unconfined compression 131, or soils with an ultimate hearing <br />of less than 3,500 lbs./sq.ft. Loose some, muck, big, Peat, swamp or landfill where soil <br />.- <br />_ . . <br />Install primary and secondary pipe and fittings in accordance with the manufacturer's instructions. <br />- <br />Test the entire piping system, i.e., vent secondary <br />RESPONSIBILITY: The Contractor accepts full responsibility for proper handling and installation <br />capacity <br />product, containment and vapor recovery <br />of the fiberglass reinforced plastic (FRP) or composite underground tanks and FRP piping, and <br />ofthP <br />Is soft are generally considered unstable soils. , <br />2. STEEL PIPE: (Galvanized or Black Iron) <br />where applicable , in accordance with the following procedure. <br />shall ensure that good workmanship; practices and construction procedures ore followed during <br />Y <br />Size excavation perimeter to allow 24" minimum between tanks and a minimum of half the tank <br />the handling and installation of the tanks and piping. <br />diameter between the tank sides/end caps and the wall of the tank hole. <br />Schedule 40 (ASTM A-120) Steel Pipe <br />Step One: Install pressure application system that includes two pressure (15 <br />The Contractor is responsible for inspection of the tanks for damage upon receipt at the job site. <br />250 Railroad Unions <br />150# Malleable Iron Fittings <br />gauges <br />psig maximum). Apply pressure air 10 psi into the piping system, <br />Note any visible damage on the delivery receipt. - <br />Filter fabric will be used to line tank hole for FRP tanks in unstable soil. <br />9 <br />Scop all joints using approved soup solution. <br />Carefully observe each joint for evidence of leaks. <br />the Company Representative onsite does not relieve the Contractor of the <br />Permanent shoring may be used to stabilize the walls of the tank hole, at the discretion of the <br />Do not use standard couplings typically furnished with the pipe. <br />The presence of <br />responsibility for proper tank handling, installation, and safety measures. : - <br />Contractor and/or Company Representative, If permanent shoring is used, follow Stable Solf <br />p <br />HANDLING OF PIPE & FITTINGS. All in installations shall to a manufacturer's <br />Step Two: Protect area around piping systems to prevent workmen, passers-by, etc., <br />` <br />size criteria. Refer to Alternate Backfill Materials, below. <br />conform pipe <br />specifications and installation <br />from entry, install pressure application system that includes two pressure gauges (150 <br />guidelines, <br />P 9 <br />psi maximum) Apply 100 psi pressure to each piping system, hold for one minute, <br />TESTING AND INSPECTION! The nature and type of tests and/or inspections ho be conducted,in <br />is for the Conk hole depth, <br />1. FIBERGLASS PIPE: Careful handling of piping is critical. Prated piping against abrasion <br />release pressure. Repeat for five cycles. <br />C <br />addition to those specifically called for on the plans or In the specticatloms, will be listed by <br />DEPTH OF TANK HOLE'. Contractor responsible establishing considering <br />l <br />from sharp or hard objects; impact damage from Improper storage, transporting, laying or <br />Representative under "Scope of Work. The cost of such tests will be poid by the <br />rise <br />the length of piping runs, to the pump blocks and vent risers, pipe burial depth, yard slope and <br />Step Three: Repeat Step One. <br />Company <br />'i <br />the following criteria; (Measure at the Remote Pump opening). <br />backfilling. Inspect all pipe for damage prior to inslallotion in the piping system. <br />Company. <br />2. STEEL PIPE. AND FITTINGSt Protect against damage to protective coating/wrapping.Record <br />9 Ptest <br />ail lest results the Company -supplied forms Company Representative's of <br />If the Company Representative determines, during the course of consirucfiion, that additional <br />P Y P <br />1, A minimum of 12" of backfill material is required under the tanks. <br />9 <br />bt <br />is required, After obtaining such approval, the Contractor shall backfill trenches to <br />es to <br />inspections or testing, whether by Company Represenlotive or a testing agency, ore necessary, <br />� � � <br />the 7'0". <br />INSTALLATION REQUIREMENTS: Interior surface of all pipe and fittings must be free from dirt, <br />pP, 9 <br />sub rode following the requirements f <br />g � 9 q s o Section 02 and materials in Section 07, <br />the Contractor shall cooperate In making arrangements for such tests. If work in question has <br />and maximum Is <br />covers and <br />2. FRP: The minimiin depth cover <br />The minimum depth cover is i'6" and the maximim is 5'0"� <br />scale, metal, fiberglass particles, etc. before connecting. <br />2. SECOND TEST (After sealing secondary Apply 10 to <br />not yet been installed and questioned material is satisfactory, payment Nor the lest shall be mode <br />Composite: of <br />piping) psi the secondary containment <br />by Company. If the material is unsatisfactory, it shall be replaced at no additional cost to <br />lines 1/4" fool from the towords the tanks. <br />Product piping muss be itched upward conlinuou is from tanks to risers a minimum of 1 4" per <br />P 9 P P Y / P <br />system. Soap all joints using approved soap solutions. <br />Company, and cost of the test shall be paid by Contractor. <br />3. Pitch the product pumploacks <br />foot. Traps or sags will not be Group all and locale as shown on the plans. <br />.the <br />permitted. piping <br />3. THIRD TEST (After connecting piping to tonks but prior to bockfitling): Apply pressure air <br />installed (which must be uncovered in order to be tested), if It is detective, the <br />4. Pilch the vent and vapor return lines 1/4" per foot towards the tanks. <br />Lines are to be Told straight, using fittings for directional and elevation changes. <br />(30 psi max) to test system. This pressure on all lines until paving is completed. There should <br />For work already <br />Contractor shall bear the expenses of such uncovering, testing, inspecllom Ducal replacement of <br />be no loss of pressure during the remainder of the construction. <br />F <br />- <br />defective material or construction. If the work is not found defective, Contractor will be allowed <br />5. Minimum of 2 1/2 inch separation for all fiberglass piping at cross -overs. <br />Do not support with foreign objects, such as scraps of wood, pipe, that may damage <br />in the or an extension of the contract time, or both, directly <br />Minimum of 6 1/2 inch separation between fiberglass piping <br />piping <br />4. FOURTH TEST After Backfiliin and Patch Paving): Applies to <br />( 9 PpDeduct lines after backfill <br />an increase contract price <br />in the trench, and the walls of the trench, <br />piping. Use foam supports. <br />and patching of concrete islands, slabs, and yard pavingis completed. <br />rd <br />attributable to such uncovering, testing, etc. <br />For bedding of piping runs and backfill of pipe trenches, refer to Section 02 and to subsequent <br />Test lines using Petro Tile Hydrostatic Line Testing equipment or approved equal. Company <br />the work in accordance with safe procticees, taking all reasonable <br />SAFETY REQUIREMENT: No person shall enter a tank hole excavation below the 5 ft. deep level <br />portions of this section. <br />assigned product, diesel fuel, or water. <br />SAFETY: Contractor shod perform <br />the Facility facilities, workmen and thre public and providing, <br />unless the walls are shored or the sides sloped as prescribed by current OSHA regulations such as <br />Conlractar to comply fully with the Procedure Manual for thhee Operation of Line Tester. <br />' <br />precautions to protect and adjacent <br />necessary, barriers, temporary bridges, lights orad watchmen, While on <br />54 CFR 45894 and 29 CFR 1926.650, 651, and 652. No exceptions. Slate or local requirements <br />CUTTING OF PIPE: <br />where reasonably, guards, <br />Company or its oVil'rotes all of Company's safety rules shall be strictly observed; <br />that are more restrictive than Company specifications are to be adhered to as though specified In <br />Test pressure sholl be 50 <br />D psi f 1.5 limes operating pressure (1507) fora remote pump system <br />the remises of <br />P P Y <br />- locations cos are specifically <br />Company specifications. The Contractor is responsible for. any design, materials, equipment, permits. <br />1. FIBERGLASS PIPE: Cut with o fine-toothed hacksaw blade or on abrasive wheel on a <br />with an allowable tolerance of 0.01D gal/hr. <br />in particular, smoking shall be limited to such and occasions <br />for shoring or side sloping a hole. <br />circular power saw. Use a saw guide or Wrap Around' To ensure a square cut end. Cut pipe <br />authorized in writing by Company. Contractor shall not perform or pernnit any act on the <br />etc., <br />- <br />end must be within 1/8" of square.. <br />Vent lines (no phase U vapor recovery): <br />premises of Company or its affiliates which Involves a fire or explosion tnozard, including <br />disposal debris by burning, without wiritlen consent of <br />FILL AND BACKFILL: All fill material shall be of a gronulor nature, free from vegetation and <br />. -. <br />welding, torch cutting and of prior <br />extraneous material. Company Representative shall Inspect and approve the material before it <br />2. STEEL PIPE: Cut with a hand or power or power-operoted pipe cutler, as in normal fitting <br />Unless required by local agency, no second test required. <br />- <br />Company. <br />is spread. Spread material In lifts not to exceed 12 inches and tamp thoroughly. When required <br />Practice. <br />E <br />The contractor is responsible for certifying that employees and subcontractors ore trained and <br />by local code, General Contractor shall provide a compaction test for certification of fill, <br />- <br />TAPERING & REAMING -Toper all cut fiberglass ends to 1-3/4 degrees using one of the <br />_ Ventlinesand vapor recovery piping (with phase II vapor recovery): <br />� certified in Hazardous Waste Operations and Emergency Response (HAZWOIPER) in accordance <br />e Hazardous <br />pipe <br />tapering tools available from the pipe manufacturer. Protect pipe during tapering to prevent <br />Contractor is responsible for vent and vapor recovery systems any locally <br />' with CFR 20. <br />BALLAST; Use water as ballast under all conditions where ballosl is required. <br />damage to pipe. The finish taper shall be smooth, clean and free from surface defects. The <br />piping passing <br />imposed test requirements. <br />length of toper for 2" diameter pipe is 1-5/8" and for 3" diameter pipe is 1-3/4". For other size <br />WARNING! .Tests indicate that prolonged or repeated exposure to petroleum) substances, in liquid <br />pipe, consult pipe manufacturer's Instructions. <br />or vapor form, may be harmful. ..Refer to Material Safely Data Sheets Ifor specific information <br />DRY HOLE CONDITION: Tanks, with backfill to top of tanks, must be ballasted if there Is any <br />on various petroleum products, <br />chance that surface or subsurface water will enter the tank hole to a depth of 23" of greater <br />Steel pipe ends are to be reamed. <br />above the bottom of the tanks. <br />BONDING &ADHESIVE SYSTEMS (Fiberglass Pipe): All fiberglass pipe surfaces to be bonded <br />Follow manufacturers precautions for fiberglass piping. resins, or solvents .used In assembling the <br />tanks backfill is to top of tanks. <br />shall be cleaned with solvent supplied by pipe manufacturer. If tapered section is wet or moist, <br />piping system, <br />.Caution - Do not ballast until <br />dry with propane torch - do not overheat or burn the pipe. If temperature is below 60' F (Ili' C), <br />f <br />worm all tapered surfaces prior to applying resin or use epoxy adhesive as recommended by the <br />C) <br />J <br />WET HOLE CONDITION: Attempt to pump water from the tank hole to maintain a "Dry Hole <br />manufacturer on oil bell and spigot joints. Mix adhesive thoroughly in accordance with <br />Condition" If unable to obtain a "Dry Hole Condition, notify Company Representative who will <br />manufacturer's instructions and apply to both surfaces. Insert the spigot end into the bell using <br />02 EXCAVATION AND BACKFILL <br />determine the course of action. Install filter fabric, lie -down "logs and bedding as specified <br />a slight turning motion (one-half turn to o full turn is necessary) and push, <br />(Supplement to Construction Specifications, M.O.S. 243)) } - <br />elsewhere. Set tank in hole, partially fill with water until it sinks firmly on the bed. Use only <br />backfill isto top lank. After backfill to top of tank, fill <br />Apply pressure until mechanical lock is achieved. Maintain bock oxial pressure on all previously <br />enough water to ballast tank until of <br />tank with water until completion of Installation <br />assembled joints to reduce the chance of separation. <br />MARK DATE REVISIONS INRIAL <br />REMOVAL OF EXISTING TANKS AND PIPING SYSTEMS: Contractor will furnish Fpermits, labor <br />equipment, except as noted, to remove existing tanks and limes per the following <br />Caution - Ballast level must never exceed water or backfill level in the hole during installation. <br />_ <br />Inspect all fittings for proper alignment and possible "bock -out" of the joints. <br />TANK AND PIPING <br />and proper <br />-Do not remove ballast until lank slob has been poured. Do not set remote pump motor until <br />' <br />Procedure. <br />ballast water has been removed from tank, <br />Follow a manufacturer's recommendations on cure time before disturbing joints or testingU.G. <br />pipe 9 <br />Contractor, as part of the contract, will execute and comply with the Ciorapony's "Addendum <br />if It is doted that the temperature will drop below F (16' C) of any time during the <br />heat the Only devices recommended by <br />INSTALLATION <br />process, joints. chemical or electrical <br />curing process, e or <br />Tank Disposal Certification Agreement." <br />P - 9 <br />.TANK HOLD-DOWNS (Tie -Downs):. Install hold-down "logs" at all locations with known water <br />w pt <br />pipe manufacturer are acceptable for this purpose. Do not use open flame or sparking devices, <br />be removed and disposed of in accordance with the Addendum Tank <br />conditions and at those locations where water is found during tank installollons. Refer to "Tank <br />such os propone torches. to cure resin. <br />9-2396 <br />C <br />C <br />All tanks and piping shall <br />Disposal Certification Agreement and applicable stale and local regulalicons, <br />Hold -Down" drawing for design, fabrication and Installation requirements, and to Section 05 of <br />these specifications and drawing F-9 (N-PET-F9P-i.DWG) <br />THREADED JOINTS: Threaded steel pipe joints must be reamed and have clean out perfect <br />25650 HWY 99 NO., <br />Removal of tanks and lines shall comply with API Recommended Prochice 1604, Removal and <br />- <br />threads and be made up with non -hardening joint compound insoluble In petroleum products <br />ACAMPO, CA. <br />Disposal of Used Underground Storage Tanks - December 1987 and Mauch 1989 supplement.' <br />44 tank bottom. Do not <br />approved by Company Representative, <br />REMOTE TURBINE: Contractor to verify turbine head will be above <br />Contractor shall also comply with current NFPA and local regulations, <br />install turbine if turbine shaft length exceeds lank diometer plus burial depth! <br />Typical joint compound: <br />Company Representative is responsible for removal of all reusable product from the tanks. <br />facility. - <br />Notify Company Representative, who will determine the course of action, if shaft exceeds tank <br />- diameter plus burial depth. <br />Reclorseal <br />Gilbarco Pipe Joint Compound <br />Chevron <br />Product will be returned to terminal or other company <br />- <br />Permatex 57 <br />Excavate to the lop of each tank. Care must be taken to prevent breaking any piping and <br />or approved equal <br />releasing product in the environment. Prior to starting excavation, the O=dractor shall ensure <br />- <br />LW9St + RaIOfI <br />Northwest 9 <br />power is shut off to any circuit, whose conduit may cross the excovaliom. <br />FIBERGLASS TO STEEL PIPE OR FLEXIBLE CONNECTORS: Thread flbergloss threaded -end <br />B <br />B <br />adopters into the steel pipe or fitting before bonding onto the fiberglass pipe. Use mate end <br />fiberglass fitting when connecting to flexible connectors. All flexible connectors are mate -swivel by <br />- <br />female. The female end connects to the fiberglass piping. <br />ROBERT H. LEE & ASSOCIATES, INC. <br />ARCHrTECTURE ENCANEEFW40 ENVgON.IEWAL 81!94 CEB <br />1137 NORTH McDOWELL BOULEVARD PETALUMA CA. 96954 (707) 765-1660 <br />JOHN W. JORNSON. ARCHITECT JAMES H. RAY, CIVIL ENGINEER <br />" <br />RHL REVIEW INMAL DATE DATE: <br />- <br />PRELIMINARY <br />PLANNING DR. BY: <br />- <br />STEEL BID <br />- <br />BLDG PERMIT v3j APPR,: SG <br />A <br />A <br />GENERAL BID RHLX $344.10 <br />- <br />PERMIT REV'S <br />' <br />- <br />r-NJCTRULTInu SHELT <br />I <br />M <br />� <br />ILs1 <br />71 <br />to <br />I5 <br />M <br />rT <br />17 <br />