My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
12101
>
2200 - Hazardous Waste Program
>
PR0505950
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 11:50:41 AM
Creation date
11/6/2018 8:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505950
PE
2229
FACILITY_ID
FA0004407
FACILITY_NAME
STAR BUILDING SYSTEMS
STREET_NUMBER
12101
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05132007
CURRENT_STATUS
02
SITE_LOCATION
12101 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\B\BRANDT\12101\PR0505950\COMPLIANCE INFO\COMPLIANCE INFO PRE 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Company policy or mission statement demonstrating that commitment to all <br /> employees, business partners, and customers; <br /> • The support of employee training and monitoring; <br /> • The establishment of incentive programs to encourage employees to design and use <br /> new waste minimization ideas and those who successfully improve their work <br /> practices and techniques resulting in a successful reduction in the generation of <br /> hazardous waste. • <br /> 4) The persuasion of Star Buildings' paint vendor, Trinity Coatings, to begin supplying their <br /> paint in 50 gallon fiber drums(as of 6/1/2003 this has been accomplished). <br /> • This container type can be recycled. <br /> • The containers generate little or no waste; <br /> For source reduction measures (2), (3), and(4): <br /> • Input Changes -N/A The same raw materials would be used in the production <br /> process. <br /> • Operational Improvements -N/A No major operational changes would be necessary. <br /> • Production Process Changes -N/A No major production processes would be <br /> necessary. <br /> • Product Reformulations -N/A The same steel beams and the same primer, and paint <br /> would be used. <br /> • Administrative Steps - Management must provide support and staff time to complete <br /> the following tasks: The evaluation of current work practices. All possible more- <br /> efficient methods of performing tasks related to the paint process would have to be <br /> studied and noted with a system devised for evaluating success. The needed <br /> employee training would have to be developed and implemented. The suggested <br /> employee incentive program would have to be developed and implemented. <br /> NOTE: For measure#4, the administrative steps would focus more on the <br /> relationship between Star Buildings and the vendor than on employee use of the <br /> containers. <br /> Evaluation of suggested source reduction measures (2), (3), and (4): <br /> • Change in Hazardous Waste -There would be a significant reduction in the <br /> generation of hazardous paint waste. <br /> • Technical Feasibility- The measures are technically feasible. <br /> • Economic Evaluation- There is minimal cost for Star Buildings to allot time and <br /> resources for the evaluation,development, and implementation of the suggested <br /> measures. <br /> • Effects on Product Quality-There are no projected effects on product quality. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.