Laserfiche WebLink
• 0 <br />SWRCB, January 2002 FPIAL DRAFT Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />r T... AA IV .i n i n <br />- -- - r ter. u rlPluU manufacturer L-fflndustryStandard ❑ Professional Engineer — I <br />❑ Other (Specif-t) <br />Test Method Used: Pressure ❑Vacuum ❑ H}drostatic <br />❑ <br />Test Equipment Used: <br />Piping Run # / I Piping Run # y <br />-� <br />Equipment Resolution. <br />., Piping Rin # ( Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />tJK <br />Jk <br />�G <br />K <br />Piping Diameter: <br />Length of Piping Run: <br />00 <br />Product Stored: <br />Ivfethod and location of <br />pipin7-::n isolation: <br />tl E1� <br />t02CWn� <br />l €L <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />/7 r,,j <br />D I! <br />I <br />J <br />Test Start Time: <br />: p J <br />O S <br />J o <br />Initia.1Reading(R): <br />SZQj <br />d <br />Test End Time: <br />e USS <br />loses <br />Final Reading (RF): <br />I <br />Test Duration: <br />Change in Reading (RF -Rt): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result <br />[amass ❑Fail I <br />ElPass ❑Fail <br />ElPass ❑Fail ❑Pass ❑Fail <br />Comments — (Include information on repairs made prior to testing and recommended olloty-up jor ailed tests.) <br />