My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2300 - Underground Storage Tank Program
>
PR0507164
>
COMPLIANCE INFO_2002 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/6/2018 9:27:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2008
RECORD_ID
PR0507164
PE
2361
FACILITY_ID
FA0007722
FACILITY_NAME
ORLANDOS
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
10517048
CURRENT_STATUS
01
SITE_LOCATION
18754 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\18754\PR0507164\COMPLIANCE INFO 2002 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2008
QuestysRecordDate
1/17/2017 5:26:41 PM
QuestysRecordID
3312375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br />SWRCB, January 2002 FPIAL DRAFT Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />r T... AA IV .i n i n <br />- -- - r ter. u rlPluU manufacturer L-fflndustryStandard ❑ Professional Engineer — I <br />❑ Other (Specif-t) <br />Test Method Used: Pressure ❑Vacuum ❑ H}drostatic <br />❑ <br />Test Equipment Used: <br />Piping Run # / I Piping Run # y <br />-� <br />Equipment Resolution. <br />., Piping Rin # ( Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />tJK <br />Jk <br />�G <br />K <br />Piping Diameter: <br />Length of Piping Run: <br />00 <br />Product Stored: <br />Ivfethod and location of <br />pipin7-::n isolation: <br />tl E1� <br />t02CWn� <br />l €L <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />/7 r,,j <br />D I! <br />I <br />J <br />Test Start Time: <br />: p J <br />O S <br />J o <br />Initia.1Reading(R): <br />SZQj <br />d <br />Test End Time: <br />e USS <br />loses <br />Final Reading (RF): <br />I <br />Test Duration: <br />Change in Reading (RF -Rt): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result <br />[amass ❑Fail I <br />ElPass ❑Fail <br />ElPass ❑Fail ❑Pass ❑Fail <br />Comments — (Include information on repairs made prior to testing and recommended olloty-up jor ailed tests.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.