My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1985-1986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT
>
113
>
2300 - Underground Storage Tank Program
>
PR0504104
>
REMOVAL REMOVAL 1985-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:50 PM
Creation date
11/7/2018 8:19:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1985-1986
RECORD_ID
PR0504104
PE
2381
FACILITY_ID
FA0006079
FACILITY_NAME
PASMA BROTHERS, INC
STREET_NUMBER
113
Direction
N
STREET_NAME
WALNUT
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25906041
CURRENT_STATUS
02
SITE_LOCATION
113 N WALNUT AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WALNUT\113\PR0504104\REMOVAL 1985-1986 .PDF
QuestysFileName
REMOVAL 1985-1986
QuestysRecordDate
10/17/2017 9:46:35 PM
QuestysRecordID
3686484
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I, <br />I , <br />I 1 <br />I , <br />I! <br />I <br />I <br />Page 4 <br />Proj . No. E88-029 <br />DISCUSSIONS OF FINDINGS <br />The soil profile, as interpreted from the soil borings, generally consisted of <br />a fine to medium sand or a fine sand to the bottom of the borings. For more <br />detailed information regarding subsoils encountered at the project site, please <br />refer to the logs of the soil borings included at the end of this report. <br />Groundwater was not encountered in either of the soil borings. Review of <br />published data regarding groundwater conditions in the area of the project site <br />has shown groundwater to be present at an elevation of approximately 38 feet <br />above mean sea level. According to the United States Geologic Survey 7.5 <br />minute Salida topographic quadrangle map, the elevation of the project site is <br />approximately 65 feet above mean sea level. This calculated to a depth to <br />groundwater at the project site of 27 feet below existing grade. <br />The results of the chemical analysis on samples obtained during the drilling <br />operation are listed in Table I below. <br />TABLE I <br />' Concentration of Petroleum Constituents in Soils <br />(Concentrations in parts per million) <br />Petroleum Constituent 1,000 gal. 750 gal. <br />Benzene ND ND <br />Toluene ND ND <br />iEthylbenzene ND ND <br />Total Xylene Isomers ND ND <br />' Total Volatile Hydrocarbons ND 4 <br />Total Lead ND ND <br />Ethylene Dibromide ND ND <br />' ND = Non-detected <br />I <br />' KRAZAN & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.