My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
2300 - Underground Storage Tank Program
>
PR0232482
>
COMPLIANCE INFO_1993 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:47 PM
Creation date
11/7/2018 10:23:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2003
RECORD_ID
PR0232482
PE
2361
FACILITY_ID
FA0003719
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4747\PR0232482\COMPLIANCE INFO 1993-2003.PDF
QuestysFileName
COMPLIANCE INFO 1993-2003
QuestysRecordDate
1/23/2018 8:03:31 PM
QuestysRecordID
3770094
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> t r Tar*no/ogy <br /> TEST DATE: 12/30/98 8900 SHOAL CREEK, BUILDING 200 <br /> AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 2207028 <br /> CLIENT: CHEVRON, U.S.A. SITE: CHEVRON 200766 <br /> 's7lNK'INFORMATION-, rx a <br /> Tank ID: 87 3 Tank manifolded: Bottom to top fill in inches: <br /> Product: REG UNLEAD Vent manifolded: Bottom to grade in inches: <br /> Capacity in gallons: Vapor recovery manifolded: Fill pipe length in inches: <br /> Diameter in inches: Overfill protection: Fill pipe diameter in inches: <br /> Length in inches: Overspill protection: Stage I vapor recovery: DUAL <br /> Material: Installed: Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> TANK TESTRESULTS 3a: 85t.Msthoc' S,L' ,y° , *LWDETECT1DRbTES7.;HgSUL`'lSKIMT> <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: <br /> Fluid volume in gallons: Model: <br /> Tank water level in inches: S/N: <br /> Test time: NOT Open time in sec: <br /> Number of thermisters: TESTED Holding psi: NOT NOT <br /> Specific gravity: Resiliency cc: TESTED TESTED <br /> Water table depth in inches: est leak rate mVm: <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: <br /> Result: Results: <br /> COMMENTS COMMENTS <br /> i7LLAGE' ES I ESU I $ ` b[ 1 d�' 1E1N TES ESULT3r " "mgt 6 - ' <br /> �a �1 <br /> , <br /> : <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length (ft): 200.0 <br /> Results: Test psi: 50 <br /> Bleedback cc: 100 <br /> DATA FOR UTS-4T ONLY: Test time (min): 30 <br /> Test 1:Start time: 23:30 <br /> Time of test 1: Finish psi: 46 NOT NOT NOT <br /> Temperature: NOT Vol change cc: 23 TESTED TESTED TESTED <br /> Test 2: Start time: 2 3:4 0 <br /> Flow rate (cfh): TESTED Finish psi: so <br /> Time of test 2: Vol change cc: 0 <br /> Test 3:Start time: 23:50 <br /> Temperature: Finish psi: so <br /> Flow rate (cfh): Vol change cc: o <br /> Time of test 3: Final gph: 0.007 <br /> Temperature: Result: PASS <br /> Flow rate (cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 01/05/1999 11:52 MSHAW <br />
The URL can be used to link to this page
Your browser does not support the video tag.