My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
2300 - Underground Storage Tank Program
>
PR0231304
>
INSTALL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:00:36 PM
Creation date
11/7/2018 11:24:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1986
RECORD_ID
PR0231304
PE
2332
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\2211\PR0231304\INSTALL 1986.PDF
QuestysFileName
INSTALL 1986
QuestysRecordDate
8/10/2017 9:55:11 PM
QuestysRecordID
3569860
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN LOCALLTH DISTRICT <br /> 1601 East Haul venue <br /> _ Phone 466-WWI Page 2 of 2 <br /> 0 STOCKTON, CALIFORNIA <br /> INSPECTION REPORT <br /> Owner/Operator California Fuels DatelL6-6_ 19 <br /> L,tication 2211 N Wilson Way, Stockton <br /> Facility Name: Connell Motor Truck Co. <br /> K9(�hPk9PXIR�(X9FhgES19(7f klFktR;PJC Rl@fl9F <br /> 2 Provide written monitoring,nroredura ac per cart 2632(d) <br /> including description of overfill protection monitoring <br /> procedure as per Sect. 2635 (B) 9A, 9B and 9C. <br /> 3 Provide written response plan for any unatithnri7ari <br /> release as per Sect. 2632 (d) 2A and 2B. <br /> 4. Single wall piping must be monitored with inventory <br /> reconciliation (daily) and annual precision test or <br /> biannual pressure test. See compliance sheet for <br /> monitoring alternative #5 for inventory reconciliation <br /> requirements. <br /> Received Notice: <br /> JOGI KHANN .D., MPH, Dist ' t Health OfEi r <br /> ty Registered Sanitarian <br /> EH 00 20 7185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.