My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_1998 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:01:47 PM
Creation date
11/7/2018 12:49:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2001
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\W\WEST\4040\PR0231963\COMPLIANCE INFO 1998 - 2001 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� s <br /> General Requirements <br /> 3 of 8 <br /> J. Personnel Working Conditions: Work by Contractor shall be done during regular working <br /> hours between 7:00 AM and 4:30 PM. The facility is in operation during these times. The <br /> yard will be occupied and in operation during construction. <br /> Care shall be taken by Contractor to insure normal working conditions for PG&E <br /> personnel, without disturbance as nearly as practicable. <br /> K. Cleanup: With respect to Contractor's own operation, Contractor shall maintain the work <br /> site and related structures, equipment, and facilities in a clean, orderly condition during <br /> progress of the Work, and also clean up debris to the satisfaction of PG&E. If, in PG&E's <br /> opinion, the work site is hazardous due to Contractor's noncompliance, and if upon notice <br /> to correct the condition Contractor fails to do so, PG&E may stop the Work until cleanup is <br /> performed or order others to perform cleanup work and charge Contractor for this Work, <br /> Building surfaces, including glass, shall be left clean. <br /> L Overtime: Additional work shifts and overtime shall be authorized only in accordance with <br /> the General Conditions. <br /> 1.03 WORK SITE FACILITIES <br /> A. Water: Contractor shall be allowed to use existing water facilities at the work site subject <br /> to such regulations as may be imposed by PG&E. <br /> B. Sanitary Facilities: Contractor shall be allowed to use existing sanitary facilities.. <br /> C. Telephone Facilities: Telephone facilities are not available at work site. Contractor shall <br /> provide its own telephone facilities. <br /> L. Illumination: Contractor shall provide and maintain necessary lighting to conduct their <br /> Work in a safe and workmanlike manner. <br /> E. Electricity: PG&E will furnish electric power required at voltage and current presently <br /> available at the work site at no cost to Contractor. This power will be provided by PG&E <br /> at the nearest suitable existing electrical outlet or other existing source. Temporary or <br /> portable wiring beyond the outlet or other existing source shall be furnished and installed <br /> by and at the expense of Contractor and shall comply with the prevailing codes and <br /> standards. Contractor shall remove any temporary or portable wiring upon completion of <br /> Work. <br /> F. Temporary Fences and Barricades: Contractor shall provide and maintain all temporary <br /> fences and barricades as required for the Work. Contractor shall remove the above <br /> temporary fences and barricades upon the completion of the Work. <br /> G. Storage: Contractor shall provide temporary storage sheds or other enclosed temporary <br /> structures as required or as deemed necessary by PG&E to protect materials and <br /> equipment stored on the work site. Contractor shall remove the above temporary storage <br /> structures prior to the completion of Work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.