Laserfiche WebLink
j <br /> j•�\ 1 <br /> 1 <br /> Peterson Hydraulics, Inc. <br /> 1653 W. El Segundo Blvd. Gardena,CA. 90249 <br /> (310)323-3155 phone-(310)323-3606 fax <br /> Contractor License: 631515 www.petersonhydraulics.com <br /> "Providing Service To The Vehicle Service Industry" <br /> Response to SJC HED Second Deficiency Notice <br /> For SR0069410 <br /> San Joaquin RTD, 2849 E. Myrtle, Stockton <br /> 8-25-14 <br /> Deficiency Response or location of response on drawings <br /> Item <br /> Note: All drawing changes made as a result of the second deficiency notice have <br /> been noted as delta 2. <br /> 1 Added manufacturer for FRP"smith fiberglass"to FS0.03 <br /> Added ASTM piping specification number for Sch 40 vent and primary black iron pipe to i <br /> FS0.03. This piping is manufactured by many different mills to ASTM A53 gr A. <br /> Added manufacturer for Line leak detection"Veeder Root"to FS0.03. <br /> 2 Piping penetrations for fuel lines will be Smith Fiberglass as shown. Electrical <br /> penetrations will be Bravo boots. See revised FS0.03 <br /> 3 Manufacturers installation certifications for technicians are included in this submittal i <br /> "Item 3". Persons doing this work will have certifications on site during the work. j <br /> 4 Primary piping transition from fiberglass to steel shown in revised details 3 and 4 on ' <br /> drawing FS9.04. <br /> 5 Note 2 regarding over fill prevention on drawings FS09.03 and FS09.04 has been revised <br /> to better explain the function of over fill prevention. <br /> 6 10,000 gallon diesel tank type on FS1.00 and FS2.16 have been relabeled"gasoline" <br /> 7 Monitoring of above ground piping will be done using vacuum and tied to the secondary <br /> i drawing vacuum monitoring system on the below ground piping..g See detail 3 on $FS9.01. <br /> 8 Under dispenser containment for the above ground diesel dispensers has been added as <br /> detail 1 on FS9.02. <br /> I <br /> 1 <br />