My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J JUL 15 2016 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Indus Standard <br /> �Y ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum <br /> ❑ Other(Specify) ❑ Hydrostatic <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> Piping Run#87 F Piping Run#89 Piping Run#91 Piping Run#Diesel <br /> Piping Material: Poly P0 Poly Poly <br /> Piping Manufacturer: Environ Environ Environ <br /> Environ <br /> Piping Diameter: Z» 2„ Z., <br /> 2" <br /> Length of Piping Run: 100, 100, 100, 100, <br /> Product Stored: Gasoline Gasoline Gasoline <br /> Method and location of Diesel <br /> i in -run isolation: Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Filtings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> startin test: <br /> Test Start Time: 8:30 am 8:30 am 8:30 am 8:30 am <br /> Initial Reading(Rt): 5si <br /> P 5 pat 5 psi 5 psi <br /> Test End Time: <br /> 9:30 am 9:30 am 9:30 am 9:30 am <br /> Final Reading(RF): 5si <br /> P 5 psi 5 Psi 5 psi <br /> Test Duration: 1 hr. I hr. 1 hr. 1 hr. <br /> Change in Reading(RF-R4): None None None None <br /> Pass/Fail Threshold or <br /> Criteria: No detectable Loss No detectable Loss No detectable Loss No detectable Loss <br /> Test Result: O Pass ❑Fail ® Pass ❑Faia © Pass ❑Fail 0 PPass ❑Fail <br /> COmments—(include information on repairs made prior to testing,,and recommended follow-up forLailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.