Laserfiche WebLink
�J JUL 15 2016 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Indus Standard <br /> �Y ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum <br /> ❑ Other(Specify) ❑ Hydrostatic <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> Piping Run#87 F Piping Run#89 Piping Run#91 Piping Run#Diesel <br /> Piping Material: Poly P0 Poly Poly <br /> Piping Manufacturer: Environ Environ Environ <br /> Environ <br /> Piping Diameter: Z» 2„ Z., <br /> 2" <br /> Length of Piping Run: 100, 100, 100, 100, <br /> Product Stored: Gasoline Gasoline Gasoline <br /> Method and location of Diesel <br /> i in -run isolation: Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Filtings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> startin test: <br /> Test Start Time: 8:30 am 8:30 am 8:30 am 8:30 am <br /> Initial Reading(Rt): 5si <br /> P 5 pat 5 psi 5 psi <br /> Test End Time: <br /> 9:30 am 9:30 am 9:30 am 9:30 am <br /> Final Reading(RF): 5si <br /> P 5 psi 5 Psi 5 psi <br /> Test Duration: 1 hr. I hr. 1 hr. 1 hr. <br /> Change in Reading(RF-R4): None None None None <br /> Pass/Fail Threshold or <br /> Criteria: No detectable Loss No detectable Loss No detectable Loss No detectable Loss <br /> Test Result: O Pass ❑Fail ® Pass ❑Faia © Pass ❑Fail 0 PPass ❑Fail <br /> COmments—(include information on repairs made prior to testing,,and recommended follow-up forLailed tests) <br />