My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 16 1016 <br /> t"fli <br /> 6. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Sump#87 Fill Sump#89 Fill Sump#91 Fill Sump#Diesel <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 64" 64" 64" 65" <br /> Height from Tank Top to Top of 16" 16" 15" 14" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 15" 15" 15" 15" <br /> Electrical Penetration: <br /> Condition of sump prior to Good Good Good Good <br /> testing: <br /> Portion of Sump Tested 2"above piping 2"above piping 2"above piping 2"above piping <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 11:32 am 11:32 am 11:32 am 12:11 put <br /> Initial Reading 7.5440 5.0831 6.1393 4.6653 <br /> Test End Time: 11:48 am 11:48 am 11:48 am 12:26 pro <br /> Final Reading(RF): 7.5443 5.0846 6.1407 4.6641 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Chane in Reading r-R : 0.0003 0.0015 0.0014 0.0012 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/_0.002" <br /> Test Result: © Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Is there a sensor in the sump? ®Yes ❑No ®Yes ❑No ®Yes ❑No ®Yes ❑No <br /> Does the sensor alarm when <br /> either product or water is ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> detected? <br /> Was sensor removed for testing? O Yes❑No❑NA O Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing. ®Yes❑No❑ NA ®Yes❑No❑ NA ®Yes 11No❑ NA ®Yes❑No❑ NA <br /> Co M ments—(include information on repairs made prior to testing and recommendedfollow-up forfailed tests) <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.