My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
low 11. <br /> JUL 15 2016 <br /> 7. SPILL/OVERFILL CONTAINMENT BOXES ' �•`• I.: <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Spill Box k 87 Fill Spill Box H 89 Fill Spill Box 0 91 Fill Spill Box,4 Diesel <br /> Bucket Diameter: 12" 12" 1 12" 12" <br /> Bucket Depth: 10" 10" 10" 10" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 10:26 am 10:06 am 10:06 am 10:48 am <br /> Initial Reading(Rj: 4.7266 4.0421 4.1390 2.4703 <br /> Test End Time: 11:41 am 10:21 am 1021 am 11:03 am <br /> Final Reading(RP): 4.7265 4.0419 4.1387 2.4696 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Change in Reading(RRi): 0.0001 0.0002 0.0003 0.0007 <br /> Pass/Fail Threshold or <br /> Criteria: +/-0,002" +/_0.002" +/-0.002" +/-0.002" <br /> Test Result: © Pass ❑Fail ® Pass ❑Fail 131 Pass ❑Fail I ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.