Laserfiche WebLink
JUL 15 2016 <br /> 8. SPELL/OVERFILL CONTAINMENT BOXES- .�.v► <br /> fTest <br /> y is Not Equi ped With Spill/Overfill Containment Boxes ❑ <br /> verfill Containment Boxes are Present,but were Not Tested ❑ - <br /> ethod Developed By- ❑Spill Bucket Manufacturer ®Indus Standard <br /> trS' ❑Professional Engineer <br /> ❑Other(Spec) <br /> ethod Used: ❑Pressure ❑Vacuum <br /> (Specify) ®Hydrostatic <br /> ❑Other <br /> uipment Used:Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Vapor SPBI Box#87 Vapor Spill Box#89 Vapor Spill Box#91 <br /> Bucket Diameter: 12" 12" <br /> 12" <br /> Bucket Depth: 10" 10" <br /> 10" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 10:48 am 10:26 am 10:26 am <br /> Initial Reading(Rj): 3.9184 3.7758 3.9467 <br /> Test End Time: 11:03 am 10:41 am 10:41 am <br /> Final Reading(RF): 3.9168 3.7747 3.9466 <br /> Test Duration: 15 min. 15 min. 15 min. <br /> Change in Reading(RF R4): 0.0016 0.0011 0.0001 <br /> Pass/Fail Threshold or <br /> Criteria: +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> C 0 M menis—(include information on repairs made prior to testing and recommended follow-up forfailed tests) <br /> i <br /> 7 <br />