My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar 08 16 011-1 1p JP Petroleum Service 91637 fo <br /> 73 p.3 . <br /> SWRCB;January 2002 APR 0 G 2016 <br /> Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed 13y: X Piping Manufacturer industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Mcthod Used: X Pressure 7 Vacuum ❑ Hydrostatic <br /> :1 Other(Specify) <br /> — <br /> est Equipment Used: Pressure Gauge Hquipment Resolution: 0-I PSi <br /> Piping Run# l Piping Run #2 g��Jping #3 Piping Run #4 <br /> _--- <br /> Piping Material: Poly Poly Poly - <br /> Piping Manufacturer: Environ Environ --- Environ <br /> Piping Diameter. 2" 2" 2'Length of Piping Run: t60` 120' t60' <br /> Product Stored: Regular(north) Regular(south) orth) premium{south) <br /> Method and location of Test booti in -run isolation: Fest boat oat Test boot <br /> Wait time between applying <br /> pressurelvacuumlwater and 5 ruin 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 8:45 8:45 8:45 <br /> Initial heading(l4): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 9:45 9:45 9:45 <br /> Final heading(RF): 5 PSI 5 PSE 5 PSI <br /> Test Duration. 1 Hour 1 Hour 1 }lour I Haut. <br /> Change in Reading(R,.-R4): 0 0 0 <br /> Pass/Fail Threshold or 0 drop p 0 drop 4 drop 0 drop <br /> Test Result: ❑ Pass 0 Fail x Pass ❑Fail x Pass ❑Fail x Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing. and recomrnendedfollow-repfor ailed tests) <br /> Test penetration onregular line on side 11 has tear in boot unable to test line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.