Laserfiche WebLink
Mar 08 16 011-1 1p JP Petroleum Service 91637 fo <br /> 73 p.3 . <br /> SWRCB;January 2002 APR 0 G 2016 <br /> Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed 13y: X Piping Manufacturer industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Mcthod Used: X Pressure 7 Vacuum ❑ Hydrostatic <br /> :1 Other(Specify) <br /> — <br /> est Equipment Used: Pressure Gauge Hquipment Resolution: 0-I PSi <br /> Piping Run# l Piping Run #2 g��Jping #3 Piping Run #4 <br /> _--- <br /> Piping Material: Poly Poly Poly - <br /> Piping Manufacturer: Environ Environ --- Environ <br /> Piping Diameter. 2" 2" 2'Length of Piping Run: t60` 120' t60' <br /> Product Stored: Regular(north) Regular(south) orth) premium{south) <br /> Method and location of Test booti in -run isolation: Fest boat oat Test boot <br /> Wait time between applying <br /> pressurelvacuumlwater and 5 ruin 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 8:45 8:45 8:45 <br /> Initial heading(l4): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 9:45 9:45 9:45 <br /> Final heading(RF): 5 PSI 5 PSE 5 PSI <br /> Test Duration. 1 Hour 1 Hour 1 }lour I Haut. <br /> Change in Reading(R,.-R4): 0 0 0 <br /> Pass/Fail Threshold or 0 drop p 0 drop 4 drop 0 drop <br /> Test Result: ❑ Pass 0 Fail x Pass ❑Fail x Pass ❑Fail x Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing. and recomrnendedfollow-repfor ailed tests) <br /> Test penetration onregular line on side 11 has tear in boot unable to test line. <br />