My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 11:11:26 AM
Creation date
11/8/2018 9:52:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2017 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2017 - PRESENT
QuestysRecordDate
6/16/2017 6:31:32 PM
QuestysRecordID
3443120
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E] <br />PA-'iwitch panel expands the <br />"monitoring capability of each <br />monitoring circuit in the elec- <br />tronic control panel to two <br />sensors. <br />5 Secondary Containment <br />Collar <br />This device provides second- <br />ary containment of piping <br />leaks and the submersible <br />pump. The collar must be <br />electronically monitored to <br />detect the accumulation of <br />leaked product. <br />6 <br />E <br />A <br />F <br />Collar <br />This float switch separately <br />monitors the containment <br />collar which is isolated from <br />the tank monitoring system. <br />7 Turbine Enclosure <br />Provides a termination point <br />for electrical connections and <br />double-wall piping. An optional <br />adhesive kit is available to seal <br />the turbine enclosure to the <br />containment collar to prevent <br />the ingress of groundwater. <br />8 Fitting Kits for Turbine <br />Enclosure <br />Optional field -installed fitting <br />kits are available for piping <br />and electrical connections to <br />the turbine enclosure. <br />V- ptional Accessories <br />Supplied by Your Local <br />Petroleum Distributor: <br />9 Overfill Spill Container <br />Contains delivery hose con- <br />tents if the tank is overfilled. <br />10 Overfill Shut -Off Switch <br />Prevents product from backing <br />up into vent and vapor lines if <br />the tank is overfilled. <br />11 Submersible Pump <br />12 Fill Tube <br />13 Dispenser <br />14 Double -Wall Fiberglass <br />Pipe <br />15 Electronic Inventory <br />Gauge, <br />Monitors product level in the <br />primary tank. <br />-Typical double-wall tank installation with double- <br />wall piping on the product lines. tank overfill pre- <br />vention, overspill containment, and independent <br />tank and piping monitoring. <br />Note: Always consult local codes for specific <br />piping detail. Other restrictions may apply <br />to venting, filling, and vapor recovery. <br />
The URL can be used to link to this page
Your browser does not support the video tag.