My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/8/2018 9:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\REYNOLDS RANCH\2680\PR0535432\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G11Is� <br /> CIVIL ENGINEEflING,LAND PLANNING,SURVEYING <br /> 2 <br /> 1$ <br /> DECEIVE® <br /> ��,• December 4, 2012 <br /> Eno%NE FEDERAL EXPRESS <br /> (209)468-3453 DEC U5 2012 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Aris Cacapit, REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Road <br /> Stockton, CA 85205 <br /> RE: Response to Comments— Underground Storage Tank Install and Retrofit Application <br /> Costco Gasoline—Fuel Additive Program <br /> 2680 Reynolds Ranch Parkway, Lodi, California 95240 <br /> Costco Loc. No. 1091 /Our Job No. 14573 <br /> Dear Aris: <br /> We have revised the plans for the above-referenced project in accordance with the comments in your <br /> November 20, 2012 email and additional verbal comments received on December 3, 2012. Enclosed are <br /> the following documents for your review and approval: <br /> 1. One (1)copy of your email, dated November 20, 2012 <br /> 2. One(1)signed revised Tank 4 Monitoring Plan, including the revised Site Map <br /> 3. One (1) copy of the revised Monitoring Plan Site Map to accompany the Monitoring Plan for <br /> Tanks 1-3 <br /> 4. One (1) copy of the revised Application for Underground Storage Tank Installation Permit, <br /> Page 8 <br /> 5. One (1) copy of the cut sheet for Bravo F-Series Rigid Fiberglass Fittings for Double-Wall <br /> Fiberglass Sumps <br /> 6. One(1)copy of the cut sheet for the Veeder-Root dual-Float Hydrostatic Sensor <br /> 7. One (1) copy of the New Construction Enhanced Leak Detection Work Plan prepared by <br /> Leak Detection Technologies LLC <br /> 8. Three (3) copies each of the revised Sheets C1 and T4 prepared by Barghausen Consulting <br /> Engineers, Inc., dated December 3, 2012 <br /> The following outline provides each of your comments in italics exactly as written, along with a <br /> narrative response describing how each comment was addressed: <br /> • Site Map C1 of 12 under General Site Development Notes: #6 "It shall be the contractor's <br /> responsibility to notify the inspector 24 hours in advance of backfilling all construction. <br /> Change 24 to 48. <br /> Response: Site Development Note#6 has been revised to reflect 48 hours. <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES ♦ OLYMPIA,WA ♦ CONCORD,CA ♦ TEMECULA,CA <br /> w .barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.