Laserfiche WebLink
SWRC ,January 2002 Page Of_ <br /> 6. PIPING SUMP TESTING <br /> Test Mhod Developed By: O Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> Other(Spec) <br /> Test M hod Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Spectb) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> .... ..,,.....,. .._��.z:::a�, �a-�xy.�.c ��.*u<,sums..,.�:e..��r�^a�.�r.-:�.�'�^Mw <br /> Sump#1 Sump# Sump It Sump# <br /> Sump Diameter: 42" <br /> Sump depth: 54" <br /> Sump rviaterial: Fiberglass <br /> Height fromTank Tap to Top of 29„ <br /> Hi he tlPiping Penetration: <br /> Height om Tank Top m Lowest 32" <br /> Electric I Penetration: <br /> Canditi n of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does t iae shut down when <br /> sump st nsor detects liquid(both xYes ONo ONA IIYes HNo LINA ❑Yes UNo ONA nYes ONo UNA <br /> roduct and water <br /> Turbine shutdown response time <br /> Is syste n programmed for fail-safe x Yes 0 No DNA U Yes UNo O NA O Yes U Na UNA U Yes UNo 0 NA <br /> shutdown?' <br /> Was fai-snfe verified to be Ll Yes x No 13 NA U Yes UNo O NA O Yes ONo UNA U Yes UNo I"INA <br /> o esti nal? ,. <br /> Wait time between applying ^ <br /> pressur /vacuum/water and starting 5 min 5 nun 5 min 5 min <br /> test: <br /> Test Start Time: 10:20 <br /> initial Reading(RO: .00" .00" .00" .00" <br /> Test En I Time: 10:50 <br /> Final Ri ading(RF): .00 <br /> Test Du ration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RrRt): 0 <br /> Pass/Fa I Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass U Fail O Pass O Fail O Pass O Fail O Pass O Fail <br /> Was sensor removed for testing? xYes UNo UNA xYes ONo DNA xYes ONo UNA UYes UNo ' 'NA <br /> Was sensor properly replaced and x Yes 0 No ❑NA xYes ONo DNA x Yes O No U NAI 0 Yes ONo i3 NA <br /> verifie functional after testis ? <br /> Com eats—(include in ornralion on re airs made prior to testing, and recommended allow-tt for ailed lesls <br /> ' if the a itire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk ")is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />